rail-pictures.com Linie rail-pictures.com
No registration required - login with Google, Facebook or X account! Hello guest, you are not logged in. Log in | Create account 
Forum   Contact   Legal notice
English German French Italian Spanish Polish Dutch japanisch Swedish 

First photos

41391 Photos
The Europorte 4013 with a grain train from France on route to the port of Antwerp. Vossloh-Stadler Euro4000 build in 2012 with construction N° 2637. Line 27A at Antwerp Airport. 26-08-2026
The Europorte 4013 with a grain train from France on route to the port of Antwerp. Vossloh-Stadler Euro4000 build in 2012 with construction N° 2637. Line 27A at Antwerp Airport. 26-08-2026
Mark Min

The Infrabel 9121 242 on route from the port of Antwerp to the Infrabel depot at Lier. Plasser & Theurer type Unimat 09-X3 build in 2020 with construction N° 7012. Line 27A at Antwerp Airport. 26-08-2026
The Infrabel 9121 242 on route from the port of Antwerp to the Infrabel depot at Lier. Plasser & Theurer type Unimat 09-X3 build in 2020 with construction N° 7012. Line 27A at Antwerp Airport. 26-08-2026
Mark Min

The NMBS 828 on route from Lier to Antwerpen-Berchem station. Fresh out of the paint shop.  BN Brugge MS75 build in 1977, modernized in 2018. NMBS Class MS75 (MR75/EMU75) : Between 1975 and 1977 44 of these EMU (Electric Multi Unit) were build by BN Brugge. Numbers 801 to 844. Number of Carriages: 4. Length: 99,03m. Number os seats: 368. Max speed: 140km/h. Power supply: 3000V and 1500V (NL). Modernized between 2015 and 2020. Nickname: Pig Nose. Line 27A at Antwerp Airport. 26-08-2026
The NMBS 828 on route from Lier to Antwerpen-Berchem station. Fresh out of the paint shop. BN Brugge MS75 build in 1977, modernized in 2018. NMBS Class MS75 (MR75/EMU75) : Between 1975 and 1977 44 of these EMU (Electric Multi Unit) were build by BN Brugge. Numbers 801 to 844. Number of Carriages: 4. Length: 99,03m. Number os seats: 368. Max speed: 140km/h. Power supply: 3000V and 1500V (NL). Modernized between 2015 and 2020. Nickname: Pig Nose. Line 27A at Antwerp Airport. 26-08-2026
Mark Min

Belgium / Electric multiple units / AM 75

19 1600x1066 Px, 31.08.2026

The NMBS 439 on route from Lier to Antwerpen-Berchem station. BN Brugge build in 1983, modernized in 2015. NMBS Class MS80-82 and 83 (MR80 / EMU80) : Between 1979 and 1985 140 of these EMU (Electric Multi Unit) were build by BN Brugge. Numbers: 301 to 440. Number of carriages, original 2 now after modernizing: 3. Length (3 carriages) 75,80m. Number of seats (3 carriages) 248. Max speed: 160km/h. Power supply: 3000V and 1500V. Line 27A at Antwerp Airport. 26-08-2026
The NMBS 439 on route from Lier to Antwerpen-Berchem station. BN Brugge build in 1983, modernized in 2015. NMBS Class MS80-82 and 83 (MR80 / EMU80) : Between 1979 and 1985 140 of these EMU (Electric Multi Unit) were build by BN Brugge. Numbers: 301 to 440. Number of carriages, original 2 now after modernizing: 3. Length (3 carriages) 75,80m. Number of seats (3 carriages) 248. Max speed: 160km/h. Power supply: 3000V and 1500V. Line 27A at Antwerp Airport. 26-08-2026
Mark Min

Belgium / Electric multiple units / AM 80 (Break)

17 1600x1066 Px, 31.08.2026

The three-section articulated tram 9007 of the SOCIMI T8000 type (electric AEG – year of manufacture 1990 - 92) of ATAC (Azienda per i Trasporti Autoferrotranviari del Comune di Roma) is standing on July 13, 2022, at the Roma Termini station, ready for departure as line 14 to Viale Palmiro Togliatti via Porta Maggiore.

The articulated trams of the SOCIMI T8000 type:
A total of 41 units of these bidirectional low-floor articulated railcars of the SOCIMI T8000 type were built by the Milan-based manufacturer SOCIMI (electric part by AEG) (33 built between 1990 and 1992 and 8 built in 2003).

TECHNICAL DATA:
Vehicle type: six-axle three-section articulated railcar
Number: 41
Manufacturer: SOCIMI / electric part AEG
Years of manufacture: 1990-1992 and 2003
Track gauge: 1,435 mm (standard gauge)
Axle arrangement: Bo'+2+Bo'
Length: 21.10 m
Width: 2.3 m
Height: 3.42 m
Driving and running wheel diameter: 680 mm
Unladen weight: 30.5 t
Motors/Power: 4 x 100 kW = 400 kW
Maximum speed: 70 km/h
Remarks: 3 sections; 4 doors
Power system: 600 Volt DC (=) via overhead line
The three-section articulated tram 9007 of the SOCIMI T8000 type (electric AEG – year of manufacture 1990 - 92) of ATAC (Azienda per i Trasporti Autoferrotranviari del Comune di Roma) is standing on July 13, 2022, at the Roma Termini station, ready for departure as line 14 to Viale Palmiro Togliatti via Porta Maggiore. The articulated trams of the SOCIMI T8000 type: A total of 41 units of these bidirectional low-floor articulated railcars of the SOCIMI T8000 type were built by the Milan-based manufacturer SOCIMI (electric part by AEG) (33 built between 1990 and 1992 and 8 built in 2003). TECHNICAL DATA: Vehicle type: six-axle three-section articulated railcar Number: 41 Manufacturer: SOCIMI / electric part AEG Years of manufacture: 1990-1992 and 2003 Track gauge: 1,435 mm (standard gauge) Axle arrangement: Bo'+2+Bo' Length: 21.10 m Width: 2.3 m Height: 3.42 m Driving and running wheel diameter: 680 mm Unladen weight: 30.5 t Motors/Power: 4 x 100 kW = 400 kW Maximum speed: 70 km/h Remarks: 3 sections; 4 doors Power system: 600 Volt DC (=) via overhead line
Armin Schwarz

Italy / Trams / Rome

22 1400x948 Px, 31.08.2026

In Blonay, the CEV GTW ABeh 2/6 7502  Blonay  is waiting for its next deployment.

August 23, 2026
In Blonay, the CEV GTW ABeh 2/6 7502 "Blonay" is waiting for its next deployment. August 23, 2026
Stefan Wohlfahrt

Switzerland / Private Companies / MVR/CEV

9 1400x920 Px, 31.08.2026

The Blonay-Chamby train will depart soon; it's worth taking a quick look at the Blonay station with the CEV MVR GTW ABeh 2/6 7506 and 7502.

August 23, 2026
The Blonay-Chamby train will depart soon; it's worth taking a quick look at the Blonay station with the CEV MVR GTW ABeh 2/6 7506 and 7502. August 23, 2026
Stefan Wohlfahrt

Switzerland / Private Companies / MVR/CEV

11 1400x939 Px, 31.08.2026

The CEV MVR GTW ABeh 2/6 7503 arrives at Blonay coming from Les Pléiades, from here the train will continue to Vevey. On the right side of the image, the two ABeh 2/6 7506 and 7504 are parked.

August 28, 2026
The CEV MVR GTW ABeh 2/6 7503 arrives at Blonay coming from Les Pléiades, from here the train will continue to Vevey. On the right side of the image, the two ABeh 2/6 7506 and 7504 are parked. August 28, 2026
Stefan Wohlfahrt

Switzerland / Private Companies / MVR/CEV

11 1400x929 Px, 31.08.2026

While it is easy to get the main railway in focus from near or far, it is quite difficult with the model railway, as the depth of field is quite limited at this scale.  
The picture shows the Märklin mini club SBB Ae 3/6 10460 on my Z-scale layout.

August 29, 2026
While it is easy to get the main railway in focus from near or far, it is quite difficult with the model railway, as the depth of field is quite limited at this scale. The picture shows the Märklin mini club SBB Ae 3/6 10460 on my Z-scale layout. August 29, 2026
Stefan Wohlfahrt

A classic DB IC/EC with the 103 107-9 is running on my Z gauge layout.

August 29, 2026
A classic DB IC/EC with the 103 107-9 is running on my Z gauge layout. August 29, 2026
Stefan Wohlfahrt

Shortly after the Plan Morier stop, the TPC ASD ABe 4/8 473 is operating as R71 on the way to Les Diablerets.

September 1, 2026
Shortly after the Plan Morier stop, the TPC ASD ABe 4/8 473 is operating as R71 on the way to Les Diablerets. September 1, 2026
Stefan Wohlfahrt

The TPC ABe 4/8 472 is on its way to Aigle against the backdrop of the charming village of Vers l'Eglise.

September 1, 2026
The TPC ABe 4/8 472 is on its way to Aigle against the backdrop of the charming village of Vers l'Eglise. September 1, 2026
Stefan Wohlfahrt

The TPC ABe 4/8 472 is on its way to Aigle at Vers l'Eglise. 

September 1, 2026
The TPC ABe 4/8 472 is on its way to Aigle at Vers l'Eglise. September 1, 2026
Stefan Wohlfahrt

The PKP EU07-160 is arriving with its express train at Gdynia Główna Osobowa.

Analog photo from August 29, 1994
The PKP EU07-160 is arriving with its express train at Gdynia Główna Osobowa. Analog photo from August 29, 1994
Stefan Wohlfahrt

Poland / Electric locomotives / EU07 | 5 140

9 1400x956 Px, 01.09.2026

The PKP electric locomotive EU07-350 is standing with its IR to Berlin Lichtenberg at Gdynia Główna Osobowa. Analog photo from August 29, 1994.
The PKP electric locomotive EU07-350 is standing with its IR to Berlin Lichtenberg at Gdynia Główna Osobowa. Analog photo from August 29, 1994.
Stefan Wohlfahrt

Poland / Electric locomotives / EU07 | 5 140

8 1400x906 Px, 01.09.2026