rail-pictures.com Linie rail-pictures.com
No registration required - login with Google, Facebook or X account! Hello guest, you are not logged in. Log in | Create account 
Forum   Contact   Legal notice
English German French Italian Spanish Polish Dutch japanisch Swedish 

The refurbished small RB (Réseau Breton) draisine Dm 2/2 N° 3 "Biniou" of the Blonay-Chamby railway is on a test drive in Blonay, it will be on the weekend of 7th/8th.

(ID 52746)


The refurbished small RB (Réseau Breton) draisine Dm 2/2 N° 3  Biniou  of the Blonay-Chamby railway is on a test drive in Blonay, it will be on the weekend of 7th/8th. Sept. officially put back into operation and presented to guests. 

In addition, the Dm 2/2 has been with the B-C for a very long time, as the following comments show: 

Around fifteen handcars from the company “Billard”, a renowned French railcar manufacturer, were in use on the almost 400 km long route network in Brittany.
An ingenious device of movable rails mounted on a pivot point allows the trolley to be turned around to change direction or parked on a section of track next to the main track to clear the track for trains. 

In 1968, Blonay-Chamby in Loudeac removed some vehicles from the Breton network as they were being dismantled. Since there was still a small space available on the transport wagons, it was decided at the last moment to also take trolley number 3, which was available at the station, with us.  This draisine, called “Le Biniou” in BC, will be used for the initial maintenance work between Blonay and Chamby and also for the dismantling of the line between St-Légier and Châtel-St-Denis. It is later taken out of service after it is damaged. Some thirty years later, the arrival of a new member, a retired auto mechanic, brought this vehicle back to life. Since the original “Renault Frégate” engine was beyond repair, a Peugeot J9 engine was adapted to it.
(Translated from a text by J.D.Paré/Blonay-Chamby)   
Recently revised, the Dm 2/2 N° 3 will be on the 7th/8th. Will be used in September 2024.
August 18, 2024

The refurbished small RB (Réseau Breton) draisine Dm 2/2 N° 3 "Biniou" of the Blonay-Chamby railway is on a test drive in Blonay, it will be on the weekend of 7th/8th. Sept. officially put back into operation and presented to guests.

In addition, the Dm 2/2 has been with the B-C for a very long time, as the following comments show:

Around fifteen handcars from the company “Billard”, a renowned French railcar manufacturer, were in use on the almost 400 km long route network in Brittany.
An ingenious device of movable rails mounted on a pivot point allows the trolley to be turned around to change direction or parked on a section of track next to the main track to clear the track for trains.

In 1968, Blonay-Chamby in Loudeac removed some vehicles from the Breton network as they were being dismantled. Since there was still a small space available on the transport wagons, it was decided at the last moment to also take trolley number 3, which was available at the station, with us. This draisine, called “Le Biniou” in BC, will be used for the initial maintenance work between Blonay and Chamby and also for the dismantling of the line between St-Légier and Châtel-St-Denis. It is later taken out of service after it is damaged. Some thirty years later, the arrival of a new member, a retired auto mechanic, brought this vehicle back to life. Since the original “Renault Frégate” engine was beyond repair, a Peugeot J9 engine was adapted to it.
(Translated from a text by J.D.Paré/Blonay-Chamby)
Recently revised, the Dm 2/2 N° 3 will be on the 7th/8th. Will be used in September 2024.
August 18, 2024

Stefan Wohlfahrt http://klein-aber-fein---imagination.startbilder.de/ 25.08.2024, 489 Views, 0 Comments

EXIF: SONY DSLR-A350, Date 2024:08:18 09:49:20, Exposure time: 1/100, Aperture: 50/10, ISO400, Focal length: 180/10

0 Comments, All comments
The RhB Bernina Railway ABe 4/4 I No. 35 is shunting at Chaulin.

Oct. 17, 2026
The RhB Bernina Railway ABe 4/4 I No. 35 is shunting at Chaulin. Oct. 17, 2026
Stefan Wohlfahrt

The Blonay–Chamby Railway’s SEG G 2x 2/2 105 locomotive arrives at Chamby station with its steam train. After a brief stop, the train will continue on toward Chaulin.

Oct 17, 2026
The Blonay–Chamby Railway’s SEG G 2x 2/2 105 locomotive arrives at Chamby station with its steam train. After a brief stop, the train will continue on toward Chaulin. Oct 17, 2026
Stefan Wohlfahrt

Blonay - Chamby - La Der 2026 - 60 après les CEV (marking the end of the season for the Blonay–Chamby Railway, 60 years after the closure of the CEV line). The SEG G 2x 2/2 105, hauling steam train 10539 from Blonay to Chamby, arrives at Chamby station. The train terminates here. Meanwhile, the connecting train to Chaulin is due to arrive shortly on track 32. On the right, on track 1, sits the MOB GoldenPass Belle Epoque trainset PE 30 2219, bound for Montreux.
 
October 24, 2026
Blonay - Chamby - La Der 2026 - 60 après les CEV (marking the end of the season for the Blonay–Chamby Railway, 60 years after the closure of the CEV line). The SEG G 2x 2/2 105, hauling steam train 10539 from Blonay to Chamby, arrives at Chamby station. The train terminates here. Meanwhile, the connecting train to Chaulin is due to arrive shortly on track 32. On the right, on track 1, sits the MOB GoldenPass Belle Epoque trainset PE 30 2219, bound for Montreux. October 24, 2026
Stefan Wohlfahrt

Blonay - Chamby - La Der 2026 - 60 après les CEV (marking the end of the season for the Blonay–Chamby Railway, 60 years after the closure of the CEV line).

Operating as the  Biniou Express  (BEX) under train number 30115, the Dm 2/2 railcar No. 3 arrives at Chamby station on track 31. While it is, in all likelihood, the shortest passenger train in the world, it still manages to accommodate a fair number of travelers—so many, in fact, that I couldn't manage to count them all while also taking photographs; I would estimate there were at least a dozen people on board.

October 24, 2026
Blonay - Chamby - La Der 2026 - 60 après les CEV (marking the end of the season for the Blonay–Chamby Railway, 60 years after the closure of the CEV line). Operating as the "Biniou Express" (BEX) under train number 30115, the Dm 2/2 railcar No. 3 arrives at Chamby station on track 31. While it is, in all likelihood, the shortest passenger train in the world, it still manages to accommodate a fair number of travelers—so many, in fact, that I couldn't manage to count them all while also taking photographs; I would estimate there were at least a dozen people on board. October 24, 2026
Stefan Wohlfahrt