rail-pictures.com Linie rail-pictures.com
No registration required - login with Google, Facebook or X account! Hello guest, you are not logged in. Log in | Create account 
Forum   Contact   Legal notice
English German French Italian Spanish Polish Dutch japanisch Swedish 

Due to the partial closure of the Gotthard Base Tunnel (GBT), practically all passenger trains will run on the "Gotthard Panorama" route for a few weeks.

(ID 50468)


Due to the partial closure of the Gotthard Base Tunnel (GBT), practically all passenger trains will run on the  Gotthard Panorama  route for a few weeks. In the picture an SBB RABe 501  Giruno  on the way towards Arth Goldau passing through Göschenen.

September 4th 2023

Due to the partial closure of the Gotthard Base Tunnel (GBT), practically all passenger trains will run on the "Gotthard Panorama" route for a few weeks. In the picture an SBB RABe 501 "Giruno" on the way towards Arth Goldau passing through Göschenen.

September 4th 2023

Stefan Wohlfahrt http://klein-aber-fein---imagination.startbilder.de/ 04.10.2023, 553 Views, 0 Comments

EXIF: SONY ILCA-77M2, Date 2023:09:04 13:29:26, Exposure time: 1/800, Aperture: 80/10, ISO160, Focal length: 500/10

0 Comments, All comments
Noble over the Alps - a follow-up shot of the Venice Simplon-Orient-Express, which is just before the Pfaffensprung loop tunnel on the Gotthard railway on its way south.

Oct 10, 2014
Noble over the Alps - a follow-up shot of the Venice Simplon-Orient-Express, which is just before the Pfaffensprung loop tunnel on the Gotthard railway on its way south. Oct 10, 2014
Stefan Wohlfahrt

Switzerland / Galleries / The Gotthard Line

168 848x1200 Px, 20.06.2026

Due to the closure of the Gotthard Base Tunnel, all trains operated for several weeks via the old Gotthard railway lines, which are now called the Gotthard Panorama Route, resulting in a colorful range of operations. In the picture, a Re 460 with an IC heading north is passing through Göschenen.

September 4, 2023
Due to the closure of the Gotthard Base Tunnel, all trains operated for several weeks via the old Gotthard railway lines, which are now called the Gotthard Panorama Route, resulting in a colorful range of operations. In the picture, a Re 460 with an IC heading north is passing through Göschenen. September 4, 2023
Stefan Wohlfahrt

Due to the closure of the Gotthard Base Tunnel, trains ran again for several weeks on the classic Gotthard railway line. In the picture, an SBB RABe 501  Giruno  shortly before Faido on its way towards Lugano.

4 Sept. 2023
Due to the closure of the Gotthard Base Tunnel, trains ran again for several weeks on the classic Gotthard railway line. In the picture, an SBB RABe 501 "Giruno" shortly before Faido on its way towards Lugano. 4 Sept. 2023
Stefan Wohlfahrt

Due to the closure of the Gotthard Base Tunnel, trains operated again for several weeks on the classic Gotthard railway line. In the picture, an SBB RABe 501  Giruno  between Rodi Fieso and Faido heading towards Lugano.

Sept. 4, 2023
Due to the closure of the Gotthard Base Tunnel, trains operated again for several weeks on the classic Gotthard railway line. In the picture, an SBB RABe 501 "Giruno" between Rodi Fieso and Faido heading towards Lugano. Sept. 4, 2023
Stefan Wohlfahrt