rail-pictures.com
Keine Registrierung n�tig - Login mit Google-, Facebook- or X-Account! Hello guest, you are not logged in. Log in | Create account 
Forum   Contact   Legal notice
English German French Italian Spanish Polish Dutch japanisch Swedish 

Since the Gotthard Highway Tunnel, which opened in 1981, needs to be renovated, they have the luxury of building a second tube during the renovation.

(ID 53598)



Since the Gotthard Highway Tunnel, which opened in 1981, needs to be renovated, they have the luxury of building a second tube during the renovation. After the renovation, both tubes will offer more safety by separating traffic directions, but will only be allowed to have one lane per tube. It will be interesting to see whether this will be adhered to... The excavated material will be transported to Flüelen by train. The Railpool 186 497 has arrived in Airolo with its block freight train consisting of Sggrrs S 204 double wagons. The wagons are then maneuvered under the loading device (left in the picture) and loaded. January 21, 2025

Since the Gotthard Highway Tunnel, which opened in 1981, needs to be renovated, they have the luxury of building a second tube during the renovation. After the renovation, both tubes will offer more safety by separating traffic directions, but will only be allowed to have one lane per tube. It will be interesting to see whether this will be adhered to... The excavated material will be transported to Flüelen by train. The Railpool 186 497 has arrived in Airolo with its block freight train consisting of Sggrrs S 204 double wagons. The wagons are then maneuvered under the loading device (left in the picture) and loaded. January 21, 2025

Stefan Wohlfahrt http://klein-aber-fein---imagination.startbilder.de/ 07.02.2025, 421 Views, 0 Comments

EXIF: SONY ILCA-77M2, Date 2025:01:21 10:27:47, Exposure time: 1/640, Aperture: 50/10, ISO50, Focal length: 350/10

0 Comments, All comments
The Railpool locomotive 186 107 is shortly before the Château de Chillon on its way towards St Maurice.

April 17, 2026
The Railpool locomotive 186 107 is shortly before the Château de Chillon on its way towards St Maurice. April 17, 2026
Stefan Wohlfahrt

Lineas 186 258 hauls the Nievenheimer steel train through Kaarst-Broicherseite on 24 April 2026.
Lineas 186 258 hauls the Nievenheimer steel train through Kaarst-Broicherseite on 24 April 2026.
Leonardus Schrijvers

RTB 186 428 hauls the blerick container train through Lage Zwaluwe on the evening of 27 April 2026.
RTB 186 428 hauls the blerick container train through Lage Zwaluwe on the evening of 27 April 2026.
Leonardus Schrijvers

On 6 June 2021 the Sun slowly sets above Valburg whilst CT 186 151 hauls a sister loco dit and the Bottroper coal train towards Germany.
On 6 June 2021 the Sun slowly sets above Valburg whilst CT 186 151 hauls a sister loco dit and the Bottroper coal train towards Germany.
Leonardus Schrijvers






Statistik
 
Diese Webseite verwendet Cookies, um Inhalte und Anzeigen zu personalisieren und Zugriffe zu analysieren. Sie können zwischen personalisierter und nicht-personalisierter Werbung wählen.
Mit der Nutzung dieser Seite stimmen Sie der Verwendung von Cookies zu.