Two SBB GIRUNO RABe 501s are in Faido on their way south. At first glance, Faido train station appears as it did before the GTB went into operation, but upon closer inspection (and it is hardly visible in the photo) tracks 1 and 4 are no longer in use, the switches are screwed and the contact line is grounded.
Sept. 4, 2023
Stefan Wohlfahrt http://klein-aber-fein---imagination.startbilder.de/ 30.09.2023, 159 Calls, 0 Comments
EXIF: SONY ILCA-77M2, Date 2023:09:04 12:03:38, Exposure time: 1/640, Blend: 80/10, ISO125, Focal length: 220/10
35 1200x821 Px, 28.07.2025
24 1200x852 Px, 28.07.2025
54 1200x804 Px, 11.06.2025
101 1200x1022 Px, 23.01.2025