SPCC 32 & 61 have left Ilo, climbed about 150m onto the first "step", which is a plain before the ascend through the desert to Toquepala
(ID 10433)
SPCC 32 & 61 have left Ilo, climbed about 150m onto the first "step", which is a plain before the ascend through the desert to Toquepala
Rupprecht von Gersdorff 19.03.2012, 1399 Views, 0 Comments
EXIF: Date 2011:08:29 12:38:27, Exposure time: 0.002 s (1/500) (1/500), Aperture: f/13.0, ISO200, Focal length: 87.00 (87/1)
0 Comments, All comments
No, this is not Puente Verrugas but PUENTE CARRION, it is the biggest bridge on the Ferrocarril Central.
and : it carries much more than 60 tons - FCCA 1012 has easily 200 tons alone...
Rupprecht von Gersdorff
Rupprecht von Gersdorff
Peru / Various / Various
3154 1 1024x682 Px, 29.03.2012
Below Matucana, on the Balta-Loops, FCCA 1012 exits the last tunnel of the loop-section
Rupprecht von Gersdorff
Rupprecht von Gersdorff
Peru / Various / Various
1716 1024x682 Px, 29.03.2012
Below Matucana, on the Balta-Loops, FCCA 1012 rolls above a tiny bridge before entering the next tunnel.
Rupprecht von Gersdorff
Rupprecht von Gersdorff
Peru / Various / Various
1772 1024x682 Px, 29.03.2012
Peru / Various / Various
1978 1024x682 Px, 29.03.2012








