rail-pictures.com Linie rail-pictures.com
No registration required - login with Google, Facebook or X account! Hello guest, you are not logged in. Log in | Create account 
Forum   Contact   Legal notice
English German French Italian Spanish Polish Dutch japanisch Swedish 

First photos

42561 Photos
CFL locomotive 4002 is pushing its passenger train past Lellingen towards Luxembourg, next stop is Kautenbach. 10.2026
CFL locomotive 4002 is pushing its passenger train past Lellingen towards Luxembourg, next stop is Kautenbach. 10.2026
De Rond Hans und Jeanny

Luxembourg / Electric locomotives / Série 4000

16 1600x1065 Px, 29.11.2026

De Lijn 7304 at platform B, level -2 at metro station Van Eeden. Bombardier Flexity 2 7-sections: A total of 24 of these trams were build in 2015 and 2017-2018, all in service. Numbers: 7301 to 7310 and 7349 to 7362. Low floor, 7 sections, 1 direction, max speed: 70km/h, Max 340 passengers, Power: 660kW at 700V, 6x Bombardier MITRAC 500 engines of 110kW, Length: 42,70m, Wide: 2,30m, Weight: 56,4 ton, Antwerp name: Albatros XL. Metro Station Van Eeden: It opened in 1990 and is the only underground station on the left bank of the river Schelde. It is situated under the Frederik Van Eeden square and has one entrance at the street level on the square. It has 2 underground levels, is completely build with bricks and the platforms are at a depth of 23m. Level -1 an open stations hall with view on the tracks at level -2. Level -2: the platform hall with 2 65m long platforms. Platform A: Line 3 to P+R Merksem, line 5 to Wijnegem, line 9 to Silsburg and line 15 to P+R Boechout. Platform B: Line 3 to P+R Melsele, line 5 to P+R Linkeroever, line 9 to Regatta and line 15 to P+R Linkeroever. Antwerpen. 03-05-2026
De Lijn 7304 at platform B, level -2 at metro station Van Eeden. Bombardier Flexity 2 7-sections: A total of 24 of these trams were build in 2015 and 2017-2018, all in service. Numbers: 7301 to 7310 and 7349 to 7362. Low floor, 7 sections, 1 direction, max speed: 70km/h, Max 340 passengers, Power: 660kW at 700V, 6x Bombardier MITRAC 500 engines of 110kW, Length: 42,70m, Wide: 2,30m, Weight: 56,4 ton, Antwerp name: Albatros XL. Metro Station Van Eeden: It opened in 1990 and is the only underground station on the left bank of the river Schelde. It is situated under the Frederik Van Eeden square and has one entrance at the street level on the square. It has 2 underground levels, is completely build with bricks and the platforms are at a depth of 23m. Level -1 an open stations hall with view on the tracks at level -2. Level -2: the platform hall with 2 65m long platforms. Platform A: Line 3 to P+R Merksem, line 5 to Wijnegem, line 9 to Silsburg and line 15 to P+R Boechout. Platform B: Line 3 to P+R Melsele, line 5 to P+R Linkeroever, line 9 to Regatta and line 15 to P+R Linkeroever. Antwerpen. 03-05-2026
Mark Min

Belgium / Trams / Tram Antwerp

2 1600x1066 Px, 29.11.2026

RFO 186 219 hauls a coal train towards Duisburg through Blerick on 12 November 2026. Coal trains used to be hauled only by DB cargo, burt since RCC (ÖBB Cargo's international player) and RFO  have gained some big coal train contracts, in that field, more variety is on the rise.
RFO 186 219 hauls a coal train towards Duisburg through Blerick on 12 November 2026. Coal trains used to be hauled only by DB cargo, burt since RCC (ÖBB Cargo's international player) and RFO have gained some big coal train contracts, in that field, more variety is on the rise.
Leonardus Schrijvers

DB cargo 189 094 hauls an LNG block train through Blerick from Geleen-Lutterade (Diesel traction to Venlo, henceforth with electric) towards Vlissingen-Sloehaven.
DB cargo 189 094 hauls an LNG block train through Blerick from Geleen-Lutterade (Diesel traction to Venlo, henceforth with electric) towards Vlissingen-Sloehaven.
Leonardus Schrijvers

Germany / Electric locomotives / 189

9 1200x800 Px, 29.11.2026

In what could be the last year of Diesel operation on the Maaslijn (Meuse Line; Roermond--Venlo--Nijmegen) Arriva 382 'JAN VAN KUYK' is about to call at Blerick on 12 November 2026. Engineering works for the electrification of that entire line haven geared up in full speed.
In what could be the last year of Diesel operation on the Maaslijn (Meuse Line; Roermond--Venlo--Nijmegen) Arriva 382 'JAN VAN KUYK' is about to call at Blerick on 12 November 2026. Engineering works for the electrification of that entire line haven geared up in full speed.
Leonardus Schrijvers

SBBCI 193 520 hauls an intermodal service through Blerick towards Köln-Eiffeltor and further to basel on 12 November 2026. Due to construction works on Emmerich<=>Oberhausen, this train was diverted off the Betuweroute onto the older Brabantroute -as were many other freights on the week of 9-16 November 2026.
SBBCI 193 520 hauls an intermodal service through Blerick towards Köln-Eiffeltor and further to basel on 12 November 2026. Due to construction works on Emmerich<=>Oberhausen, this train was diverted off the Betuweroute onto the older Brabantroute -as were many other freights on the week of 9-16 November 2026.
Leonardus Schrijvers

Hungarian operator Foxrail is seen in the Ruhr Area: from a legal spot at Lintorf, FoxRail 193 828 was spotyted hauling an LKLW Walter block intermodal train on the afternoon of 19 October 2026.
Hungarian operator Foxrail is seen in the Ruhr Area: from a legal spot at Lintorf, FoxRail 193 828 was spotyted hauling an LKLW Walter block intermodal train on the afternoon of 19 October 2026.
Leonardus Schrijvers

Thyssen Krupp Steel Europe 533 runs solo through the disused station of Lintorf on 19 October 2026 and is seen from a legal, albeit somewhat cramped spot.
Thyssen Krupp Steel Europe 533 runs solo through the disused station of Lintorf on 19 October 2026 and is seen from a legal, albeit somewhat cramped spot.
Leonardus Schrijvers

Thyssen Krupp Steel Europe 547 hauls a lime block train through the disused station of Lintorf on 19 October 2026, throwing some chalk dust in the wind, and is seen from a legal, albeit somewhat cramped spot.
Thyssen Krupp Steel Europe 547 hauls a lime block train through the disused station of Lintorf on 19 October 2026, throwing some chalk dust in the wind, and is seen from a legal, albeit somewhat cramped spot.
Leonardus Schrijvers

DB cargo 187 111 hauls a block train through the disused station of Lintorf on 19 October 2026 and is seen from a legal, albeit somewhat cramped spot.
DB cargo 187 111 hauls a block train through the disused station of Lintorf on 19 October 2026 and is seen from a legal, albeit somewhat cramped spot.
Leonardus Schrijvers

Germany / Electric locomotives / 187

9 1200x800 Px, 29.11.2026

On 16 September 2026 EBV newby 2159 231 rides slowly through Hannover Hbf during a month long diversion, where the many freights from and to Lehrte Yard had to be diverted through Hannover Hbf instead of the Hbf avoiding line between Hannover-Linden and Lehrte.
On 16 September 2026 EBV newby 2159 231 rides slowly through Hannover Hbf during a month long diversion, where the many freights from and to Lehrte Yard had to be diverted through Hannover Hbf instead of the Hbf avoiding line between Hannover-Linden and Lehrte.
Leonardus Schrijvers

De Lijn 7307 at platform A, level -2 at metro station Meir. Bombardier Flexity 2 7-sections: A total of 24 of these trams were build in 2015 and 2017-2018, all in service. Numbers: 7301 to 7310 and 7349 to 7362. Low floor, 7 sections, 1 direction, max speed: 70km/h, Max 340 passengers, Power: 660kW at 700V, 6x Bombardier MITRAC 500 engines of 110kW, Length: 42,70m, Wide: 2,30m, Weight: 56,4 ton, Antwerp name: Albatros XL. Metro Station Meir: It opened at the 25 of March 1975 together with stations Groenplaats and Opera it are the 3 oldest metro stations of Antwerpen. It is situated under the shopping street Meir and is a big and luxery station with 9 entrances/exits to the street. It has 2 underground levels. Level -1 has 2 separate station halls with their own connections to the street level and the platform hall at level -2. Level -2: Platform A: Line 3 to P+R Merksem, line 5 to Wijnegem, line 9 to Silsburg and line 15 to P+R Boechout. Platform B: Line 3 to P+R Melsele, line 5 to P+R Linkeroever, line 9 to Regatta and line 15 to P+R Linkeroever. The platforms are 90m long. Antwerpen 03-05-2026
De Lijn 7307 at platform A, level -2 at metro station Meir. Bombardier Flexity 2 7-sections: A total of 24 of these trams were build in 2015 and 2017-2018, all in service. Numbers: 7301 to 7310 and 7349 to 7362. Low floor, 7 sections, 1 direction, max speed: 70km/h, Max 340 passengers, Power: 660kW at 700V, 6x Bombardier MITRAC 500 engines of 110kW, Length: 42,70m, Wide: 2,30m, Weight: 56,4 ton, Antwerp name: Albatros XL. Metro Station Meir: It opened at the 25 of March 1975 together with stations Groenplaats and Opera it are the 3 oldest metro stations of Antwerpen. It is situated under the shopping street Meir and is a big and luxery station with 9 entrances/exits to the street. It has 2 underground levels. Level -1 has 2 separate station halls with their own connections to the street level and the platform hall at level -2. Level -2: Platform A: Line 3 to P+R Merksem, line 5 to Wijnegem, line 9 to Silsburg and line 15 to P+R Boechout. Platform B: Line 3 to P+R Melsele, line 5 to P+R Linkeroever, line 9 to Regatta and line 15 to P+R Linkeroever. The platforms are 90m long. Antwerpen 03-05-2026
Mark Min

Belgium / Trams / Tram Antwerp

2 1600x1066 Px, 29.11.2026

The local people of Köln-Gremberg own their market gardens and that makes railway traffic watching at Köln-Gremberg yard quite easily accessible and legal -although one should not take risks or chances! On 18 November 2026 DB Cargo 189 073 hauls a mixed train into Gremberg yard. Loco drivers rarely get frightened by the daily portion of railway fans photographing here since decades.
The local people of Köln-Gremberg own their market gardens and that makes railway traffic watching at Köln-Gremberg yard quite easily accessible and legal -although one should not take risks or chances! On 18 November 2026 DB Cargo 189 073 hauls a mixed train into Gremberg yard. Loco drivers rarely get frightened by the daily portion of railway fans photographing here since decades.
Leonardus Schrijvers

Germany / Electric locomotives / 189

9 1200x800 Px, 29.11.2026

The local people of Köln-Gremberg own their market gardens and that makes railway traffic watching at Köln-Gremberg yard quite easily accessible and legal -although one should not take risks or chances! On 18 November 2026CapTrain 248 034 hauls a steel train into Gremberg yard. Loco drivers rarely get frightened by the daily portion of railway fans photographing here since decades.
The local people of Köln-Gremberg own their market gardens and that makes railway traffic watching at Köln-Gremberg yard quite easily accessible and legal -although one should not take risks or chances! On 18 November 2026CapTrain 248 034 hauls a steel train into Gremberg yard. Loco drivers rarely get frightened by the daily portion of railway fans photographing here since decades.
Leonardus Schrijvers

The local people of Köln-Gremberg own their market gardens and that makes railway traffic watching at Köln-Gremberg yard quite easily accessible and legal -although one should not take risks or chances! On 18 November 2026 DB Cargo 294 771 shunts a chalk train at Gremberg yard. Loco drivers rarely get frightened by the daily portion of railway fans photographing here since decades.
The local people of Köln-Gremberg own their market gardens and that makes railway traffic watching at Köln-Gremberg yard quite easily accessible and legal -although one should not take risks or chances! On 18 November 2026 DB Cargo 294 771 shunts a chalk train at Gremberg yard. Loco drivers rarely get frightened by the daily portion of railway fans photographing here since decades.
Leonardus Schrijvers

Germany / Diesel locomotives / 290/294

9 1200x800 Px, 29.11.2026

The local people of Köln-Gremberg own their market gardens and that makes railway traffic watching at Köln-Gremberg yard quite easily accessible and legal -although one should not take risks or chances! On 18 November 2026 ÖBB/RCC 1293 189 hauls a mixed freight past Gremberg yard. Loco drivers rarely get frightened by the daily portion of railway fans photographing here since decades.
The local people of Köln-Gremberg own their market gardens and that makes railway traffic watching at Köln-Gremberg yard quite easily accessible and legal -although one should not take risks or chances! On 18 November 2026 ÖBB/RCC 1293 189 hauls a mixed freight past Gremberg yard. Loco drivers rarely get frightened by the daily portion of railway fans photographing here since decades.
Leonardus Schrijvers

Austria / Electric locomotives / 1293

9 1200x800 Px, 29.11.2026

Yes 38, no P8: Sächsische XII H2 steam loco 38 205 stands in the massive depot of the Sächsisches Eisenbahnmuseum in Chemnitz-Hilbersdorf on 22 August 2026. The Königliche Sächsische Staatseisenbahnen (Royal Saxon State Railways) ordered 334 Ten Wheelers with Sächsische Maschinenfabrik Hartmann in response to the P8 in neighbouring Prussia. After WW-1 thirty of these locos were confisquated by the Allies as part of a massive reparations payment to France and Belgium, on which the new DRG ordered forty more of these sturdy machines. The last duties of this Class was a special train in 1971 for the MOROP Congress in Dresden in 1971. Of these machines, onlu 38 205 has escaped the cutter's torch and has found an asyulum in Chemnitz-Hilbersdorf.
Yes 38, no P8: Sächsische XII H2 steam loco 38 205 stands in the massive depot of the Sächsisches Eisenbahnmuseum in Chemnitz-Hilbersdorf on 22 August 2026. The Königliche Sächsische Staatseisenbahnen (Royal Saxon State Railways) ordered 334 Ten Wheelers with Sächsische Maschinenfabrik Hartmann in response to the P8 in neighbouring Prussia. After WW-1 thirty of these locos were confisquated by the Allies as part of a massive reparations payment to France and Belgium, on which the new DRG ordered forty more of these sturdy machines. The last duties of this Class was a special train in 1971 for the MOROP Congress in Dresden in 1971. Of these machines, onlu 38 205 has escaped the cutter's torch and has found an asyulum in Chemnitz-Hilbersdorf.
Leonardus Schrijvers

Germany / Steam locomotives / 38

2 1200x800 Px, 29.11.2026

On 2 September 2012 VSM 44 1085 basks in the Sun light at Beekbergen. Sadly, this engine has not seen any action since and is now in a rather derelict state.
On 2 September 2012 VSM 44 1085 basks in the Sun light at Beekbergen. Sadly, this engine has not seen any action since and is now in a rather derelict state.
Leonardus Schrijvers

De Lijn 7406 at platform A, level -3 at metro station Groenplaats. CAF Urbos 100 1-dirction: A total of 40 of these trams were build between 2021 and 2023, all in service. Numbers 7401 to 7440. Low Floor, 5 sections, 1 direction, max speed: 70km/h, Max 200 passengers, Power: 428kW at 700V, 4x TSA(TractionSysteme Austria) engines of 107kW, Length: 31,5m, Wide: 2,30m, Weight: 39,1 ton, Antwerp name: StadsLijner. Metro Station Groenplaats: It opened at the 25 of March 1975 together with stations Meir and Opera it are the 3 oldest metro stations of Antwerpen. It is situated under the Groenplaats square and has 2 entrances at the street level, one on the square and one at the Karel De Groote High School. It has 3 undergrond levels. Level -1: station hall, level -2: Platform B: Line 3 to P+R Melsele, line 5 to P+R Linkeroever, line 9 to Regatta and line 15 to P+R Linkeroever. Level -3: Platform A: Line 3 to P+R Merksem, line 5 to Wijnegem, line 9 to Silsburg and line 15 to P+R Boechout. The station closed on the 4th of May 2026 for the complete renovation of the tunnel section between Opera and Van Eeden. The station will also be completely rebuild, with a bigger station hall and longer and wider platforms, reopenig in 2028. Antwerpen. 03-05-2026
De Lijn 7406 at platform A, level -3 at metro station Groenplaats. CAF Urbos 100 1-dirction: A total of 40 of these trams were build between 2021 and 2023, all in service. Numbers 7401 to 7440. Low Floor, 5 sections, 1 direction, max speed: 70km/h, Max 200 passengers, Power: 428kW at 700V, 4x TSA(TractionSysteme Austria) engines of 107kW, Length: 31,5m, Wide: 2,30m, Weight: 39,1 ton, Antwerp name: StadsLijner. Metro Station Groenplaats: It opened at the 25 of March 1975 together with stations Meir and Opera it are the 3 oldest metro stations of Antwerpen. It is situated under the Groenplaats square and has 2 entrances at the street level, one on the square and one at the Karel De Groote High School. It has 3 undergrond levels. Level -1: station hall, level -2: Platform B: Line 3 to P+R Melsele, line 5 to P+R Linkeroever, line 9 to Regatta and line 15 to P+R Linkeroever. Level -3: Platform A: Line 3 to P+R Merksem, line 5 to Wijnegem, line 9 to Silsburg and line 15 to P+R Boechout. The station closed on the 4th of May 2026 for the complete renovation of the tunnel section between Opera and Van Eeden. The station will also be completely rebuild, with a bigger station hall and longer and wider platforms, reopenig in 2028. Antwerpen. 03-05-2026
Mark Min

Belgium / Trams / Tram Antwerp

2 1600x1066 Px, 29.11.2026

On 14 December 2024, VSM 50 307 stands in front of the six times daily Christmas-Express steam shuttle train at Arnhem Centraal. The weekend of 14/15 December 2024 VSM deployed six shuttle services with one train set, consisting of a dozen of coaches (from local two-axle wagons to luxurious dining cars) and a steam loco at each end. ON the evening of the 14th however, 50 307 took minor damages and the preservationist of the VSM decided to replace the grossOhr (Big Ear) with two Dutch 1950s Diesel locomotives.
On 14 December 2024, VSM 50 307 stands in front of the six times daily Christmas-Express steam shuttle train at Arnhem Centraal. The weekend of 14/15 December 2024 VSM deployed six shuttle services with one train set, consisting of a dozen of coaches (from local two-axle wagons to luxurious dining cars) and a steam loco at each end. ON the evening of the 14th however, 50 307 took minor damages and the preservationist of the VSM decided to replace the grossOhr (Big Ear) with two Dutch 1950s Diesel locomotives.
Leonardus Schrijvers

VSM's 23 076 enters Oss with a steam shuttle to Nijmegen from 's-Hertogenbosch on 28 September 2024. Hobbyist organisation Het Stoomgenootschap tries to organise each year a day of steam shuttles between their home town 's-Hertogenbosch and another city. For 2024 Nijmegen was chosen and four steam shuttles were planned for Saturday 28 September 2024. Sadly, due to several circumstances, one had to be cancelled due to suffering delays between 60 minutes an two hours! The first steam shuttle from 's-Hertogenbosch was planned to run through Oss toward Nijmegen, but was literally sidelined instead, adding to the delay, but giving photographers at Oss some more opportunities to take pictures. Here, VSM's 50 307 stands at Oss with the first steam shuttle of the day to get sidelined in order to let the massively delayed normal trains continue their journeys. For VSM's 50 307 it was the first performance on the main line since her extensive rebuild back to 50 307 from ReKo condition (as 50 3564).
VSM's 23 076 enters Oss with a steam shuttle to Nijmegen from 's-Hertogenbosch on 28 September 2024. Hobbyist organisation Het Stoomgenootschap tries to organise each year a day of steam shuttles between their home town 's-Hertogenbosch and another city. For 2024 Nijmegen was chosen and four steam shuttles were planned for Saturday 28 September 2024. Sadly, due to several circumstances, one had to be cancelled due to suffering delays between 60 minutes an two hours! The first steam shuttle from 's-Hertogenbosch was planned to run through Oss toward Nijmegen, but was literally sidelined instead, adding to the delay, but giving photographers at Oss some more opportunities to take pictures. Here, VSM's 50 307 stands at Oss with the first steam shuttle of the day to get sidelined in order to let the massively delayed normal trains continue their journeys. For VSM's 50 307 it was the first performance on the main line since her extensive rebuild back to 50 307 from ReKo condition (as 50 3564).
Leonardus Schrijvers

On 2 October 2012 SSN's 41 105 stands at Rotterdam Noord Goederen SSN, their home depot, during the Steam Weekend. Word got out in 2026 that after more than thurty years of having been a static exhibit, she will be restored to fully operational condition.
On 2 October 2012 SSN's 41 105 stands at Rotterdam Noord Goederen SSN, their home depot, during the Steam Weekend. Word got out in 2026 that after more than thurty years of having been a static exhibit, she will be restored to fully operational condition.
Leonardus Schrijvers

De Lijn 7310 at platform B, level -2 at metro station Opera. Bombardier Flexity 2 7-sections: A total of 24 of these trams were build in 2015 and 2017-2018, all in service. Numbers: 7301 to 7310 and 7349 to 7362. Low floor, 7 sections, 1 direction, max speed: 70km/h, Max 340 passengers, Power: 660kW at 700V, 6x Bombardier MITRAC 500 engines of 110kW, Length: 42,70m, Wide: 2,30m, Weight: 56,4 ton, Antwerp name: Albatros XL. Metro Station Opera: is a cross station of the Antwerp metro, it opened at the 25 of March 1975 (only East to West lines) together with stations Groenplaats and Meir it are the 3 oldest metro stations of Antwerpen. Closed from the 1st September 2016 to the 8th of December 2019: rebuild as a cross station. The station is situated under the Teniers Square in front of the Vlaamse Opera, it is the biggest metro station of Antwerpen. It has 6 entrances at street level and 3 underground levels, the North to South tracks are at a depth of 15m. It has a central pit so day light comes all the way down to level -3. Level -1 open station hall with connection to an underground bicycle and car park, level -2 and level -3. Level -2: East to West platforms: Platform A:  Line 3 to P+R Merksem, line 5 to Wijnegem, line 9 to Silsburg and line 15 to P+R Boechout. Platform B: Line 3 to P+R Melsele, line 5 to P+R Linkeroever, line 9 to Regatta and line 15 to P+R Linkeroever. The platforms are 90m long, only 62m in use and platform B is more than 30m wide for the connection to level -3. Level -3: Platfrom C: Line 10 to P+R Schoonselhof. Platform D: Line 10 to Wijnegem. The platforms are 90m long and fully in use. Antwerpen 03-05-2026
De Lijn 7310 at platform B, level -2 at metro station Opera. Bombardier Flexity 2 7-sections: A total of 24 of these trams were build in 2015 and 2017-2018, all in service. Numbers: 7301 to 7310 and 7349 to 7362. Low floor, 7 sections, 1 direction, max speed: 70km/h, Max 340 passengers, Power: 660kW at 700V, 6x Bombardier MITRAC 500 engines of 110kW, Length: 42,70m, Wide: 2,30m, Weight: 56,4 ton, Antwerp name: Albatros XL. Metro Station Opera: is a cross station of the Antwerp metro, it opened at the 25 of March 1975 (only East to West lines) together with stations Groenplaats and Meir it are the 3 oldest metro stations of Antwerpen. Closed from the 1st September 2016 to the 8th of December 2019: rebuild as a cross station. The station is situated under the Teniers Square in front of the Vlaamse Opera, it is the biggest metro station of Antwerpen. It has 6 entrances at street level and 3 underground levels, the North to South tracks are at a depth of 15m. It has a central pit so day light comes all the way down to level -3. Level -1 open station hall with connection to an underground bicycle and car park, level -2 and level -3. Level -2: East to West platforms: Platform A: Line 3 to P+R Merksem, line 5 to Wijnegem, line 9 to Silsburg and line 15 to P+R Boechout. Platform B: Line 3 to P+R Melsele, line 5 to P+R Linkeroever, line 9 to Regatta and line 15 to P+R Linkeroever. The platforms are 90m long, only 62m in use and platform B is more than 30m wide for the connection to level -3. Level -3: Platfrom C: Line 10 to P+R Schoonselhof. Platform D: Line 10 to Wijnegem. The platforms are 90m long and fully in use. Antwerpen 03-05-2026
Mark Min

Belgium / Trams / Tram Antwerp

2 1600x1066 Px, 29.11.2026

De Lijn 7282 at platform B, level -2 at metro station Zegel. Siemens-Bombardier MGT6-1:   A total of 84 of these trams were build between 1999 and 2012, all in service. Numbers 7201 to 7284. First by Siemens later by Bombardier. Low Floor, 5 sections, 1 direction, max speed: 70km/h, Max 250 passengers, Power: 380kW at 700V, 4x Adtranz engines of 95 kW, Length: 29,60m, Wide: 2,30m, Weight: 39 ton, Antwerp name: HermeLijn (Ermine). Metro Station Zegel: It opened on the 18th of April 2015 and is situated under the Turnhoutsebaan, district Borgerhout Antwerpen. It has 2 entrances on the street level, and 3 underground levels. Level -1: the 200m long station hall with connections to levels -2 and -3. Level -2: Platform B: Line 8 to Astrid/Centraal Station and line 10 to P+R Schoonselhof.  Level -3 Platform A: Line 8 to Wommelgem and line 10 to Wijnegem. The platforms are 90 long (60m in use). Antwerpen. 08-02-2025
De Lijn 7282 at platform B, level -2 at metro station Zegel. Siemens-Bombardier MGT6-1: A total of 84 of these trams were build between 1999 and 2012, all in service. Numbers 7201 to 7284. First by Siemens later by Bombardier. Low Floor, 5 sections, 1 direction, max speed: 70km/h, Max 250 passengers, Power: 380kW at 700V, 4x Adtranz engines of 95 kW, Length: 29,60m, Wide: 2,30m, Weight: 39 ton, Antwerp name: HermeLijn (Ermine). Metro Station Zegel: It opened on the 18th of April 2015 and is situated under the Turnhoutsebaan, district Borgerhout Antwerpen. It has 2 entrances on the street level, and 3 underground levels. Level -1: the 200m long station hall with connections to levels -2 and -3. Level -2: Platform B: Line 8 to Astrid/Centraal Station and line 10 to P+R Schoonselhof. Level -3 Platform A: Line 8 to Wommelgem and line 10 to Wijnegem. The platforms are 90 long (60m in use). Antwerpen. 08-02-2025
Mark Min

Belgium / Trams / Tram Antwerp

2 1600x1066 Px, 29.11.2026