rail-pictures.com Linie rail-pictures.com
No registration required - login with Google, Facebook or X account! Hello guest, you are not logged in. Log in | Create account 
Forum   Contact   Legal notice
English German French Italian Spanish Polish Dutch japanisch Swedish 

De Lijn 7282 at platform B, level -2 at metro station Zegel.

(ID 60108)


De Lijn 7282 at platform B, level -2 at metro station Zegel. Siemens-Bombardier MGT6-1:   A total of 84 of these trams were build between 1999 and 2012, all in service. Numbers 7201 to 7284. First by Siemens later by Bombardier. Low Floor, 5 sections, 1 direction, max speed: 70km/h, Max 250 passengers, Power: 380kW at 700V, 4x Adtranz engines of 95 kW, Length: 29,60m, Wide: 2,30m, Weight: 39 ton, Antwerp name: HermeLijn (Ermine). Metro Station Zegel: It opened on the 18th of April 2015 and is situated under the Turnhoutsebaan, district Borgerhout Antwerpen. It has 2 entrances on the street level, and 3 underground levels. Level -1: the 200m long station hall with connections to levels -2 and -3. Level -2: Platform B: Line 8 to Astrid/Centraal Station and line 10 to P+R Schoonselhof.  Level -3 Platform A: Line 8 to Wommelgem and line 10 to Wijnegem. The platforms are 90 long (60m in use). Antwerpen. 08-02-2025

De Lijn 7282 at platform B, level -2 at metro station Zegel. Siemens-Bombardier MGT6-1: A total of 84 of these trams were build between 1999 and 2012, all in service. Numbers 7201 to 7284. First by Siemens later by Bombardier. Low Floor, 5 sections, 1 direction, max speed: 70km/h, Max 250 passengers, Power: 380kW at 700V, 4x Adtranz engines of 95 kW, Length: 29,60m, Wide: 2,30m, Weight: 39 ton, Antwerp name: HermeLijn (Ermine). Metro Station Zegel: It opened on the 18th of April 2015 and is situated under the Turnhoutsebaan, district Borgerhout Antwerpen. It has 2 entrances on the street level, and 3 underground levels. Level -1: the 200m long station hall with connections to levels -2 and -3. Level -2: Platform B: Line 8 to Astrid/Centraal Station and line 10 to P+R Schoonselhof. Level -3 Platform A: Line 8 to Wommelgem and line 10 to Wijnegem. The platforms are 90 long (60m in use). Antwerpen. 08-02-2025

Mark Min 29.11.2026, 10 Views, 0 Comments

EXIF: Panasonic DMC-FZ2000, Date 2025:02:08 10:09:52, Exposure time: 10/600, Aperture: 28/10, ISO1250, Focal length: 88/10

0 Comments, All comments
De Lijn 7310 at platform B, level -2 at metro station Opera. Bombardier Flexity 2 7-sections: A total of 24 of these trams were build in 2015 and 2017-2018, all in service. Numbers: 7301 to 7310 and 7349 to 7362. Low floor, 7 sections, 1 direction, max speed: 70km/h, Max 340 passengers, Power: 660kW at 700V, 6x Bombardier MITRAC 500 engines of 110kW, Length: 42,70m, Wide: 2,30m, Weight: 56,4 ton, Antwerp name: Albatros XL. Metro Station Opera: is a cross station of the Antwerp metro, it opened at the 25 of March 1975 (only East to West lines) together with stations Groenplaats and Meir it are the 3 oldest metro stations of Antwerpen. Closed from the 1st September 2016 to the 8th of December 2019: rebuild as a cross station. The station is situated under the Teniers Square in front of the Vlaamse Opera, it is the biggest metro station of Antwerpen. It has 6 entrances at street level and 3 underground levels, the North to South tracks are at a depth of 15m. It has a central pit so day light comes all the way down to level -3. Level -1 open station hall with connection to an underground bicycle and car park, level -2 and level -3. Level -2: East to West platforms: Platform A:  Line 3 to P+R Merksem, line 5 to Wijnegem, line 9 to Silsburg and line 15 to P+R Boechout. Platform B: Line 3 to P+R Melsele, line 5 to P+R Linkeroever, line 9 to Regatta and line 15 to P+R Linkeroever. The platforms are 90m long, only 62m in use and platform B is more than 30m wide for the connection to level -3. Level -3: Platfrom C: Line 10 to P+R Schoonselhof. Platform D: Line 10 to Wijnegem. The platforms are 90m long and fully in use. Antwerpen 03-05-2026
De Lijn 7310 at platform B, level -2 at metro station Opera. Bombardier Flexity 2 7-sections: A total of 24 of these trams were build in 2015 and 2017-2018, all in service. Numbers: 7301 to 7310 and 7349 to 7362. Low floor, 7 sections, 1 direction, max speed: 70km/h, Max 340 passengers, Power: 660kW at 700V, 6x Bombardier MITRAC 500 engines of 110kW, Length: 42,70m, Wide: 2,30m, Weight: 56,4 ton, Antwerp name: Albatros XL. Metro Station Opera: is a cross station of the Antwerp metro, it opened at the 25 of March 1975 (only East to West lines) together with stations Groenplaats and Meir it are the 3 oldest metro stations of Antwerpen. Closed from the 1st September 2016 to the 8th of December 2019: rebuild as a cross station. The station is situated under the Teniers Square in front of the Vlaamse Opera, it is the biggest metro station of Antwerpen. It has 6 entrances at street level and 3 underground levels, the North to South tracks are at a depth of 15m. It has a central pit so day light comes all the way down to level -3. Level -1 open station hall with connection to an underground bicycle and car park, level -2 and level -3. Level -2: East to West platforms: Platform A: Line 3 to P+R Merksem, line 5 to Wijnegem, line 9 to Silsburg and line 15 to P+R Boechout. Platform B: Line 3 to P+R Melsele, line 5 to P+R Linkeroever, line 9 to Regatta and line 15 to P+R Linkeroever. The platforms are 90m long, only 62m in use and platform B is more than 30m wide for the connection to level -3. Level -3: Platfrom C: Line 10 to P+R Schoonselhof. Platform D: Line 10 to Wijnegem. The platforms are 90m long and fully in use. Antwerpen 03-05-2026
Mark Min

Belgium / Trams / Tram Antwerp

8 1600x1066 Px, 29.11.2026

De Lijn 7406 at platform A, level -3 at metro station Groenplaats. CAF Urbos 100 1-dirction: A total of 40 of these trams were build between 2021 and 2023, all in service. Numbers 7401 to 7440. Low Floor, 5 sections, 1 direction, max speed: 70km/h, Max 200 passengers, Power: 428kW at 700V, 4x TSA(TractionSysteme Austria) engines of 107kW, Length: 31,5m, Wide: 2,30m, Weight: 39,1 ton, Antwerp name: StadsLijner. Metro Station Groenplaats: It opened at the 25 of March 1975 together with stations Meir and Opera it are the 3 oldest metro stations of Antwerpen. It is situated under the Groenplaats square and has 2 entrances at the street level, one on the square and one at the Karel De Groote High School. It has 3 undergrond levels. Level -1: station hall, level -2: Platform B: Line 3 to P+R Melsele, line 5 to P+R Linkeroever, line 9 to Regatta and line 15 to P+R Linkeroever. Level -3: Platform A: Line 3 to P+R Merksem, line 5 to Wijnegem, line 9 to Silsburg and line 15 to P+R Boechout. The station closed on the 4th of May 2026 for the complete renovation of the tunnel section between Opera and Van Eeden. The station will also be completely rebuild, with a bigger station hall and longer and wider platforms, reopenig in 2028. Antwerpen. 03-05-2026
De Lijn 7406 at platform A, level -3 at metro station Groenplaats. CAF Urbos 100 1-dirction: A total of 40 of these trams were build between 2021 and 2023, all in service. Numbers 7401 to 7440. Low Floor, 5 sections, 1 direction, max speed: 70km/h, Max 200 passengers, Power: 428kW at 700V, 4x TSA(TractionSysteme Austria) engines of 107kW, Length: 31,5m, Wide: 2,30m, Weight: 39,1 ton, Antwerp name: StadsLijner. Metro Station Groenplaats: It opened at the 25 of March 1975 together with stations Meir and Opera it are the 3 oldest metro stations of Antwerpen. It is situated under the Groenplaats square and has 2 entrances at the street level, one on the square and one at the Karel De Groote High School. It has 3 undergrond levels. Level -1: station hall, level -2: Platform B: Line 3 to P+R Melsele, line 5 to P+R Linkeroever, line 9 to Regatta and line 15 to P+R Linkeroever. Level -3: Platform A: Line 3 to P+R Merksem, line 5 to Wijnegem, line 9 to Silsburg and line 15 to P+R Boechout. The station closed on the 4th of May 2026 for the complete renovation of the tunnel section between Opera and Van Eeden. The station will also be completely rebuild, with a bigger station hall and longer and wider platforms, reopenig in 2028. Antwerpen. 03-05-2026
Mark Min

Belgium / Trams / Tram Antwerp

9 1600x1066 Px, 29.11.2026

De Lijn 7307 at platform A, level -2 at metro station Meir. Bombardier Flexity 2 7-sections: A total of 24 of these trams were build in 2015 and 2017-2018, all in service. Numbers: 7301 to 7310 and 7349 to 7362. Low floor, 7 sections, 1 direction, max speed: 70km/h, Max 340 passengers, Power: 660kW at 700V, 6x Bombardier MITRAC 500 engines of 110kW, Length: 42,70m, Wide: 2,30m, Weight: 56,4 ton, Antwerp name: Albatros XL. Metro Station Meir: It opened at the 25 of March 1975 together with stations Groenplaats and Opera it are the 3 oldest metro stations of Antwerpen. It is situated under the shopping street Meir and is a big and luxery station with 9 entrances/exits to the street. It has 2 underground levels. Level -1 has 2 separate station halls with their own connections to the street level and the platform hall at level -2. Level -2: Platform A: Line 3 to P+R Merksem, line 5 to Wijnegem, line 9 to Silsburg and line 15 to P+R Boechout. Platform B: Line 3 to P+R Melsele, line 5 to P+R Linkeroever, line 9 to Regatta and line 15 to P+R Linkeroever. The platforms are 90m long. Antwerpen 03-05-2026
De Lijn 7307 at platform A, level -2 at metro station Meir. Bombardier Flexity 2 7-sections: A total of 24 of these trams were build in 2015 and 2017-2018, all in service. Numbers: 7301 to 7310 and 7349 to 7362. Low floor, 7 sections, 1 direction, max speed: 70km/h, Max 340 passengers, Power: 660kW at 700V, 6x Bombardier MITRAC 500 engines of 110kW, Length: 42,70m, Wide: 2,30m, Weight: 56,4 ton, Antwerp name: Albatros XL. Metro Station Meir: It opened at the 25 of March 1975 together with stations Groenplaats and Opera it are the 3 oldest metro stations of Antwerpen. It is situated under the shopping street Meir and is a big and luxery station with 9 entrances/exits to the street. It has 2 underground levels. Level -1 has 2 separate station halls with their own connections to the street level and the platform hall at level -2. Level -2: Platform A: Line 3 to P+R Merksem, line 5 to Wijnegem, line 9 to Silsburg and line 15 to P+R Boechout. Platform B: Line 3 to P+R Melsele, line 5 to P+R Linkeroever, line 9 to Regatta and line 15 to P+R Linkeroever. The platforms are 90m long. Antwerpen 03-05-2026
Mark Min

Belgium / Trams / Tram Antwerp

8 1600x1066 Px, 29.11.2026

De Lijn 7304 at platform B, level -2 at metro station Van Eeden. Bombardier Flexity 2 7-sections: A total of 24 of these trams were build in 2015 and 2017-2018, all in service. Numbers: 7301 to 7310 and 7349 to 7362. Low floor, 7 sections, 1 direction, max speed: 70km/h, Max 340 passengers, Power: 660kW at 700V, 6x Bombardier MITRAC 500 engines of 110kW, Length: 42,70m, Wide: 2,30m, Weight: 56,4 ton, Antwerp name: Albatros XL. Metro Station Van Eeden: It opened in 1990 and is the only underground station on the left bank of the river Schelde. It is situated under the Frederik Van Eeden square and has one entrance at the street level on the square. It has 2 underground levels, is completely build with bricks and the platforms are at a depth of 23m. Level -1 an open stations hall with view on the tracks at level -2. Level -2: the platform hall with 2 65m long platforms. Platform A: Line 3 to P+R Merksem, line 5 to Wijnegem, line 9 to Silsburg and line 15 to P+R Boechout. Platform B: Line 3 to P+R Melsele, line 5 to P+R Linkeroever, line 9 to Regatta and line 15 to P+R Linkeroever. Antwerpen. 03-05-2026
De Lijn 7304 at platform B, level -2 at metro station Van Eeden. Bombardier Flexity 2 7-sections: A total of 24 of these trams were build in 2015 and 2017-2018, all in service. Numbers: 7301 to 7310 and 7349 to 7362. Low floor, 7 sections, 1 direction, max speed: 70km/h, Max 340 passengers, Power: 660kW at 700V, 6x Bombardier MITRAC 500 engines of 110kW, Length: 42,70m, Wide: 2,30m, Weight: 56,4 ton, Antwerp name: Albatros XL. Metro Station Van Eeden: It opened in 1990 and is the only underground station on the left bank of the river Schelde. It is situated under the Frederik Van Eeden square and has one entrance at the street level on the square. It has 2 underground levels, is completely build with bricks and the platforms are at a depth of 23m. Level -1 an open stations hall with view on the tracks at level -2. Level -2: the platform hall with 2 65m long platforms. Platform A: Line 3 to P+R Merksem, line 5 to Wijnegem, line 9 to Silsburg and line 15 to P+R Boechout. Platform B: Line 3 to P+R Melsele, line 5 to P+R Linkeroever, line 9 to Regatta and line 15 to P+R Linkeroever. Antwerpen. 03-05-2026
Mark Min

Belgium / Trams / Tram Antwerp

8 1600x1066 Px, 29.11.2026