rail-pictures.com Linie rail-pictures.com
No registration required - login with Google, Facebook or X account! Hello guest, you are not logged in. Log in | Create account 
Forum   Contact   Legal notice
English German French Italian Spanish Polish Dutch japanisch Swedish 

Between Le Châtelard-Frontière and Vallorcine, the TMR BDeh 4/8 21—operating as regional train R 85 from Martigny to Vallorcine—travels along the French section of the line,

(ID 59915)


Between Le Châtelard-Frontière and Vallorcine, the TMR BDeh 4/8 21—operating as regional train R 85 from Martigny to Vallorcine—travels along the French section of the line, drawing power from a third rail. Dec 26, 2025

Between Le Châtelard-Frontière and Vallorcine, the TMR BDeh 4/8 21—operating as regional train R 85 from Martigny to Vallorcine—travels along the French section of the line, drawing power from a third rail. Dec 26, 2025

Stefan Wohlfahrt http://klein-aber-fein---imagination.startbilder.de/ 21.11.2026, 9 Views, 0 Comments

EXIF: SONY ILCA-77M2, Date 2025:12:26 11:06:20, Exposure time: 1/320, Aperture: 50/10, ISO200, Focal length: 170/10

0 Comments, All comments
Between Le Châtelard-Frontière and Vallorcine, the TMR BDeh 4/8 21—operating as regional train R 85 from Martigny to Vallorcine—travels along the French section of the line, drawing power from a third rail. Dec 26, 2025
Between Le Châtelard-Frontière and Vallorcine, the TMR BDeh 4/8 21—operating as regional train R 85 from Martigny to Vallorcine—travels along the French section of the line, drawing power from a third rail. Dec 26, 2025
Stefan Wohlfahrt

TMR BDe 4/8 No. 21 (90 85 838 0821-1 CH-TMRSA) is waiting at Vernayaz M-C for its departure to Vallorcine. Due to a major reconstruction of the Martigny M-C station, M-C trains will begin and end their journeys in Vernayaz until mid-March 2026. This allowed me to photograph the train—waiting for departure—from the level crossing leading to the departure track. I am not certain, however, why the trains are using an unpaved platform—accessible only via a level crossing—rather than the track adjacent to the main station platform. This makes the transfer—already an unpopular experience—even more difficult, especially for passengers with luggage. November 19, 2025
TMR BDe 4/8 No. 21 (90 85 838 0821-1 CH-TMRSA) is waiting at Vernayaz M-C for its departure to Vallorcine. Due to a major reconstruction of the Martigny M-C station, M-C trains will begin and end their journeys in Vernayaz until mid-March 2026. This allowed me to photograph the train—waiting for departure—from the level crossing leading to the departure track. I am not certain, however, why the trains are using an unpaved platform—accessible only via a level crossing—rather than the track adjacent to the main station platform. This makes the transfer—already an unpopular experience—even more difficult, especially for passengers with luggage. November 19, 2025
Stefan Wohlfahrt

In Le Trétien, our train heading to Martigny crosses the opposing train, the Beh 4/8 No. 72 on its journey from Martigny to Vallorcine. This  from the train  picture was taken during this crossing, as the windows in the BDeh 4/8 can at least partially be opened.

July 11, 2026
In Le Trétien, our train heading to Martigny crosses the opposing train, the Beh 4/8 No. 72 on its journey from Martigny to Vallorcine. This "from the train" picture was taken during this crossing, as the windows in the BDeh 4/8 can at least partially be opened. July 11, 2026
Stefan Wohlfahrt

In Le Trétien, our train heading to Martigny crosses the opposing train, the Beh 4/8 No. 72 on its journey from Martigny to Vallorcine. This picture was taken as our train was departing.

July 11, 2026
In Le Trétien, our train heading to Martigny crosses the opposing train, the Beh 4/8 No. 72 on its journey from Martigny to Vallorcine. This picture was taken as our train was departing. July 11, 2026
Stefan Wohlfahrt