rail-pictures.com Linie rail-pictures.com
No registration required - login with Google, Facebook or X account! Hello guest, you are not logged in. Log in | Create account 
Forum   Contact   Legal notice
English German French Italian Spanish Polish Dutch japanisch Swedish 
Electric locomotives 151109-6 and 151036-6, pull a Xpedys ore train, on 11.08.2011, on the right Rhein route, at Unkel to north.
Electric locomotives 151109-6 and 151036-6, pull a Xpedys ore train, on 11.08.2011, on the right Rhein route, at Unkel to north.
Armin Schwarz

Germany / Electric locomotives / 151

1020 1024x858 Px, 12.08.2011

German electric locomotive 151 139-3 from the RAILION Logistics on 05/28/2011 in Kreuztal, the locomotive was parked and now drives toward Marshalling yard.
German electric locomotive 151 139-3 from the RAILION Logistics on 05/28/2011 in Kreuztal, the locomotive was parked and now drives toward Marshalling yard.
Armin Schwarz

Germany / Electric locomotives / 151

1031 1024x677 Px, 24.07.2011

151 139-3 is running with a freight train through the main station of Kobllenz on June 25th, 2011.
151 139-3 is running with a freight train through the main station of Kobllenz on June 25th, 2011.
De Rond Hans und Jeanny

Germany / Electric locomotives / 151

1056 1014x772 Px, 11.07.2011

185 232-6, 185 312-6, 151 076-7, 185 268-0 and 185 049-4 are running through the main station of Koblenz on June 23rd, 2011.
185 232-6, 185 312-6, 151 076-7, 185 268-0 and 185 049-4 are running through the main station of Koblenz on June 23rd, 2011.
De Rond Hans und Jeanny

151 017-1 is hauling a freight train through the main station of Koblenz on June 23rd, 2011.
151 017-1 is hauling a freight train through the main station of Koblenz on June 23rd, 2011.
De Rond Hans und Jeanny

Germany / Electric locomotives / 151

1026 1014x760 Px, 04.07.2011

German electric locomotive 151 139-3 from the RAILION Logistics at the 28/05/2011 in Kreuztal (Germany). The locomotive have attached a freight train in the Marshalling yard and pulls is now it towards Hagen.
German electric locomotive 151 139-3 from the RAILION Logistics at the 28/05/2011 in Kreuztal (Germany). The locomotive have attached a freight train in the Marshalling yard and pulls is now it towards Hagen.
Armin Schwarz

Germany / Electric locomotives / 151

1219 1024x444 Px, 03.06.2011

German electric locomotive 151 139-3 from the RAILION Logistics at the 28/05/2011 in Kreuztal (Germany). The locomotive have attached a freight train in the Marshalling yard and pulls is now it towards Hagen.
German electric locomotive 151 139-3 from the RAILION Logistics at the 28/05/2011 in Kreuztal (Germany). The locomotive have attached a freight train in the Marshalling yard and pulls is now it towards Hagen.
Armin Schwarz

Germany / Electric locomotives / 151

1235 1024x682 Px, 03.06.2011

German electric locomotive 151 139-3 from the RAILION Logistics  parked at the 28/05/2011 in Kreuztal (Germany). The pantograph have just been moved out.
German electric locomotive 151 139-3 from the RAILION Logistics parked at the 28/05/2011 in Kreuztal (Germany). The pantograph have just been moved out.
Armin Schwarz

Germany / Electric locomotives / 151

1074 1024x682 Px, 01.06.2011

151 141-9 is hauling a goods train through the station Koblenz-Lützel on May 22nd, 2011.
151 141-9 is hauling a goods train through the station Koblenz-Lützel on May 22nd, 2011.
De Rond Hans und Jeanny

Germany / Electric locomotives / 151

1015 855x814 Px, 01.06.2011

DB 151 152-6 in Basel Bad Bf. 
22.06.2007
DB 151 152-6 in Basel Bad Bf. 22.06.2007
Stefan Wohlfahrt

Germany / Electric locomotives / 151

1328 730x1024 Px, 13.01.2011

The DB 151 152-8 is arriving with a Cargo train in the Basel Bad Station. 
22.06.2007
The DB 151 152-8 is arriving with a Cargo train in the Basel Bad Station. 22.06.2007
Stefan Wohlfahrt

Germany / Electric locomotives / 151

1148 724x1024 Px, 11.07.2010

everydays hard work for a heavy 6-axle loco : shove max. 8 cars of stone or coal up the about 6% grade from the Rohrdorf yard to the cement factory. A normal trainset needs 4 runs to get unloaded.
everydays hard work for a heavy 6-axle loco : shove max. 8 cars of stone or coal up the about 6% grade from the Rohrdorf yard to the cement factory. A normal trainset needs 4 runs to get unloaded.
Rupprecht von Gersdorff

Germany / Electric locomotives / 151

1457 1024x682 Px, 21.05.2010

DB 151 160-9 with a Cargo train by the sugar-manufacture in Regensburg. 
14.03.2009
DB 151 160-9 with a Cargo train by the sugar-manufacture in Regensburg. 14.03.2009
Stefan Wohlfahrt

Germany / Electric locomotives / 151

1171 682x1024 Px, 13.04.2010

151 021 on 01.08.2009 near Etterzhausen by the Felsentor!
151 021 on 01.08.2009 near Etterzhausen by the Felsentor!
Tobias Schuminetz, Hirschau

Germany / Electric locomotives / 151

1409 1024x680 Px, 03.03.2010

E 151 141-9 and a second one with a heavy cargo train in Koblenz Ehrenbreitstein.
21.02.2008
E 151 141-9 and a second one with a heavy cargo train in Koblenz Ehrenbreitstein. 21.02.2008
Stefan Wohlfahrt

Germany / Electric locomotives / 151

1090 1024x782 Px, 29.12.2009

151 104-7 with Malmtoget from Rotterdam.
Recorded on 6/12/2009 in Kaldenkirchen.
151 104-7 with Malmtoget from Rotterdam. Recorded on 6/12/2009 in Kaldenkirchen.
Manuel Höly

Germany / Electric locomotives / 151

1086 1024x683 Px, 06.12.2009

151 001-5 with a cargo train in Berlin Wuhlheide, 2007
151 001-5 with a cargo train in Berlin Wuhlheide, 2007
Thomas Wendt

Germany / Electric locomotives / 151

1192 800x600 Px, 28.08.2009