The Railpool 186 497 is waiting in Airolo for its train to be loaded with excavated material from the Gotthard road tunnel (2nd tube) in order to then take the train to Flüelen.
(ID 53510)
The Railpool 186 497 is waiting in Airolo for its train to be loaded with excavated material from the Gotthard road tunnel (2nd tube) in order to then take the train to Flüelen. The northern part of the station is in the shade due to the high mountains and the low sun at this time of year
Jan 21, 2025
Stefan Wohlfahrt http://klein-aber-fein---imagination.startbilder.de/ 22.01.2025, 451 Wyswietlenia, 0 Komentarze * przetlumaczono automatycznie
EXIF: SONY ILCA-77M2, Data 2025:01:21 11:09:05, Czas naswietlania: 1/640, Przyslona: 90/10, ISO160, Ogniskowa: 350/10
Armin Schwarz
124 1500x1000 Px, 17.10.2026
Mark Min
64 1600x1065 Px, 10.10.2026
Leonardus Schrijvers
91 1200x800 Px, 09.10.2026
Leonardus Schrijvers
87 1200x800 Px, 30.09.2026








