rail-pictures.com
No registration required - use your Google-, Facebook- or X- account to log in! Bonjour invité, vous n'êtes pas connecté. Se connecter | Compte s'inscrire 
Forum   Contact   Impressum
anglais allemand français italien espagnol polonais néerlandais mandarin / chinois indisch 

VSM's 23 076 enters Oss with a steam shuttle to Nijmegen from 's-Hertogenbosch on 28 September 2024.

(ID 52881)



VSM's  23 076 enters Oss with a steam shuttle to Nijmegen from 's-Hertogenbosch on 28 September 2024. Hobbyist organisation Het Stoomgenootschap tries to organise each year a day of steam shuttles between their home town 's-Hertogenbosch and another city. For 2024 Nijmegen was chosen and four steam shuttles were planned for Saturday 28 September 2024. Sadly, due to several circumstances, one had to be cancelled due to suffering del;ays between 60 minutes an two hours!
The first steam shuttle from 's-Hertogenbosch was planned to run thourgh Oss toward Nijmegen, but was literally sidelined instead, adding to the delay, but giving photographers at Oss some more opportunities to take pictures. Here, VSM's  23 076 enters Oss with the first steam shuttle of the day to get sidelined in order to let the massively delayed normal trains continue their journeys.

VSM's 23 076 enters Oss with a steam shuttle to Nijmegen from 's-Hertogenbosch on 28 September 2024. Hobbyist organisation Het Stoomgenootschap tries to organise each year a day of steam shuttles between their home town 's-Hertogenbosch and another city. For 2024 Nijmegen was chosen and four steam shuttles were planned for Saturday 28 September 2024. Sadly, due to several circumstances, one had to be cancelled due to suffering del;ays between 60 minutes an two hours!
The first steam shuttle from 's-Hertogenbosch was planned to run thourgh Oss toward Nijmegen, but was literally sidelined instead, adding to the delay, but giving photographers at Oss some more opportunities to take pictures. Here, VSM's 23 076 enters Oss with the first steam shuttle of the day to get sidelined in order to let the massively delayed normal trains continue their journeys.

Leonardus Schrijvers 29.09.2024, 132 Vues, 0 Commentaires

0 Commentaires, Tous les commentaires
Rédiger un commentaire
On 2 September 2012, former NS 2299 catches a drizzle at the VSM headquarters of Beekbergen.
On 2 September 2012, former NS 2299 catches a drizzle at the VSM headquarters of Beekbergen.
Leonardus Schrijvers

On 1 September 2000 VSM 532 -bleached, but with sand-yellow stripe-  catches the rain in Beekbergen.
On 1 September 2000 VSM 532 -bleached, but with sand-yellow stripe- catches the rain in Beekbergen.
Leonardus Schrijvers

On 7 September 2024 VSM 532 stands at Beekbergen during the Terug-naar-Toen train festival.
On 7 September 2024 VSM 532 stands at Beekbergen during the Terug-naar-Toen train festival.
Leonardus Schrijvers

Ex-NS 2412 stands at the VSM in Beekbergen on 6 September 2015. When NS ordered 129 locos of this Class with Alstom, the Dutch experimented with colour schemes, resulting in this turqois for 2401-2422 before the brown of the 1960s waqs introduced to the whole Class. Since VSM already had a brown 2400, they decided to buy a second loco from a French operator and painted her in this colour scheme.
Ex-NS 2412 stands at the VSM in Beekbergen on 6 September 2015. When NS ordered 129 locos of this Class with Alstom, the Dutch experimented with colour schemes, resulting in this turqois for 2401-2422 before the brown of the 1960s waqs introduced to the whole Class. Since VSM already had a brown 2400, they decided to buy a second loco from a French operator and painted her in this colour scheme.
Leonardus Schrijvers






Statistik
 
Diese Webseite verwendet Cookies, um Inhalte und Anzeigen zu personalisieren und Zugriffe zu analysieren. Sie können zwischen personalisierter und nicht-personalisierter Werbung wählen.
Mit der Nutzung dieser Seite stimmen Sie der Verwendung von Cookies zu.