rail-pictures.com
Keine Registrierung n�tig - Login mit Google-, Facebook- or X-Account! Hello guest, you are not logged in. Log in | Create account 
Forum   Contact   Legal notice
English German French Italian Spanish Polish Dutch japanisch Swedish 

After having delivered a cereals train at Duisburg, RBP 248 051 returns solo to Neuss and passes Kaarst againg on 8 August 2025.

(ID 56371)



After having delivered a cereals train at Duisburg, RBP 248 051 returns solo to Neuss and passes Kaarst againg on 8 August 2025.

After having delivered a cereals train at Duisburg, RBP 248 051 returns solo to Neuss and passes Kaarst againg on 8 August 2025.

Leonardus Schrijvers 07.01.2026, 223 Views, 0 Comments

0 Comments, All comments
The SIEMENS Vectron Dual Mode 248 077 (90 80 2248 077-0 D-NRAIL) of BM-Bahndienste GmbH (Karlsruhe) is running on June 9, 2026, with a flatcar train (4 bogie flatcars of the Rens type), through Kirchen/Sieg station towards Siegen.

The SIEMENS Vectron DM was manufactured in 2023 by Siemens Mobility GmbH in Munich-Allach under factory number 23425 and delivered in January 2024 to BM-Bahndienste GmbH, which leased the locomotive via RRL - RIVE Rail Leasing Limited (Dublin), and the locomotive was commissioned by northrail GmbH.

The hybrid locomotive (Vectron Dual Mode) can draw its traction power from the overhead catenary (2,400 kW power at the wheel) or generate it using an MTU 16V 4000 R84 V16-cylinder diesel engine (2,400 kW engine power, 2,000 kW power at the wheel).
The SIEMENS Vectron Dual Mode 248 077 (90 80 2248 077-0 D-NRAIL) of BM-Bahndienste GmbH (Karlsruhe) is running on June 9, 2026, with a flatcar train (4 bogie flatcars of the Rens type), through Kirchen/Sieg station towards Siegen. The SIEMENS Vectron DM was manufactured in 2023 by Siemens Mobility GmbH in Munich-Allach under factory number 23425 and delivered in January 2024 to BM-Bahndienste GmbH, which leased the locomotive via RRL - RIVE Rail Leasing Limited (Dublin), and the locomotive was commissioned by northrail GmbH. The hybrid locomotive (Vectron Dual Mode) can draw its traction power from the overhead catenary (2,400 kW power at the wheel) or generate it using an MTU 16V 4000 R84 V16-cylinder diesel engine (2,400 kW engine power, 2,000 kW power at the wheel).
Armin Schwarz

On 26 June 2024 CapTrain 248 035 hauls a train with tubes through Oberhausen Hbf -one of the few freights to pass through Oberhausen's  main station.
On 26 June 2024 CapTrain 248 035 hauls a train with tubes through Oberhausen Hbf -one of the few freights to pass through Oberhausen's main station.
Leonardus Schrijvers

On 2 December 2025 CapTrain 248 034 hauls a steel train through Oberhausen Dellwegstrase.
On 2 December 2025 CapTrain 248 034 hauls a steel train through Oberhausen Dellwegstrase.
Leonardus Schrijvers

RBP 248 051 hauls a cereals train through Karst Broicherseite on 8 August 2025.
RBP 248 051 hauls a cereals train through Karst Broicherseite on 8 August 2025.
Leonardus Schrijvers






Statistik
 
Diese Webseite verwendet Cookies, um Inhalte und Anzeigen zu personalisieren und Zugriffe zu analysieren. Sie können zwischen personalisierter und nicht-personalisierter Werbung wählen.
Mit der Nutzung dieser Seite stimmen Sie der Verwendung von Cookies zu.