rail-pictures.com
No registration required - use your Google-, Facebook- or X- account to log in! 您好访客,您尚未登录。 登录 | 帐户注册 
论坛   联系   版权声明
英语 德语 法语 意大利语 西班牙语 波兰语 荷兰语 普通话 / 中文 印第安 

The BFD HG 3/4 N° 3 of the Blonay-Chamby Railway is shortly after Chamby on the way to Chaulin and travels through a section of forest that is slowly but surely turning autumnal.

(ID 53010)



The BFD HG 3/4 N° 3 of the Blonay-Chamby Railway is shortly after Chamby on the way to Chaulin and travels through a section of forest that is slowly but surely turning autumnal. 

October 20, 2024

The BFD HG 3/4 N° 3 of the Blonay-Chamby Railway is shortly after Chamby on the way to Chaulin and travels through a section of forest that is slowly but surely turning autumnal.

October 20, 2024

Stefan Wohlfahrt http://klein-aber-fein---imagination.startbilder.de/ 20.10.2024, 71 观看次数, 0 评论

EXIF: SONY ILCA-77M2, 日期 2024:10:20 15:53:14, 曝光时间: 1/320, 闪锌矿: 71/10, ISO100, 焦距: 280/10

0 评论, 所有评论
撰写评论
The BFD HG 3/4 N° 3 is shunting in Blonay.

01.06.2025
The BFD HG 3/4 N° 3 is shunting in Blonay. 01.06.2025
Stefan Wohlfahrt

The BFD HG 3/4 No. 3 of the Blonay Chamby Railway is near Chaulin on its way to Chamby, but is having some trouble on the damp tracks on the incline at km 8.2. However, thanks to the driver's sensitive instinct, the train doesn't break down. 

May 3, 2025
The BFD HG 3/4 No. 3 of the Blonay Chamby Railway is near Chaulin on its way to Chamby, but is having some trouble on the damp tracks on the incline at km 8.2. However, thanks to the driver's sensitive instinct, the train doesn't break down. May 3, 2025
Stefan Wohlfahrt

The SEG G 2x 2/2 105 of the Blonay Chamby Railway is near Chantemerle on its way to Blonay. The new tracks on this section are clearly visible. During the renovation of the Baye de Clarens Viaduct, a layer of gravel was laid in the track area to allow road vehicles to access the construction site. This didn't look very attractive (at least for my taste), and I largely avoided taking pictures in this section.

May 18, 2025
The SEG G 2x 2/2 105 of the Blonay Chamby Railway is near Chantemerle on its way to Blonay. The new tracks on this section are clearly visible. During the renovation of the Baye de Clarens Viaduct, a layer of gravel was laid in the track area to allow road vehicles to access the construction site. This didn't look very attractive (at least for my taste), and I largely avoided taking pictures in this section. May 18, 2025
Stefan Wohlfahrt

The SEG G 2x 2/2 105 of the Blonay Chamby Railway is en route with its steam train from Blonay to Chamby, crossing the newly renovated Baye de Clarens viaduct. The western section of the viaduct has been rebuilt and will be able to absorb the constant mountain pressure (or the movement of the slope) towards the Baye de Clarens Gorge without deforming the bridge.

May 18, 2025
The SEG G 2x 2/2 105 of the Blonay Chamby Railway is en route with its steam train from Blonay to Chamby, crossing the newly renovated Baye de Clarens viaduct. The western section of the viaduct has been rebuilt and will be able to absorb the constant mountain pressure (or the movement of the slope) towards the Baye de Clarens Gorge without deforming the bridge. May 18, 2025
Stefan Wohlfahrt






Statistik
 
Diese Webseite verwendet Cookies, um Inhalte und Anzeigen zu personalisieren und Zugriffe zu analysieren. Sie können zwischen personalisierter und nicht-personalisierter Werbung wählen.
Mit der Nutzung dieser Seite stimmen Sie der Verwendung von Cookies zu.