rail-pictures.com
Ingen registrering krävs - logga in med Google-, Facebook- eller X-konto! Hej gäst, du är inte inloggad. Logga in | Skapa konto 
Forum   Kontakt   Impressum
engelska tyska franska italienska spanska polska nederländska japanisch svenska 

When one of the most beautiful sections of the Genova - Ventimiglia route near Cervia was replaced by a tunnel variant a few years ago, numerous photographers arrived in advance.

(ID 50440)



When one of the most beautiful sections of the Genova - Ventimiglia route near Cervia was replaced by a tunnel variant a few years ago, numerous photographers arrived in advance.
The Genova - Savona route opened in 1868. The Savona Ventimiglia continuation, which went into operation in 1972, led through difficult topography in many places and was largely routed along the sea and through the towns.
The route was initially electrified with three-phase current, later planned as V 25,000/50 Hz, and then finally in 1964/1967 it was supplied with FS DC 3000.
But by this time the single-track route along the sea was no longer sufficient to cope with the increasing traffic, so the first new routes were built in the Genova area at the end of the 1960s. In 1977, the Varazzo - Finale Ligure section was the first longer new construction section. Over time, others followed further west, but in Finale Ligure the first new section now meets the last original section. This is also the motif of the pictures from Finalie Ligure, here the FS Trenitalia IC 631 leaves the single-lane, 1136 meter long  Galleria Caprazoppa .
Photo location: end of platform)
September 16, 2023

When one of the most beautiful sections of the Genova - Ventimiglia route near Cervia was replaced by a tunnel variant a few years ago, numerous photographers arrived in advance.
The Genova - Savona route opened in 1868. The Savona Ventimiglia continuation, which went into operation in 1972, led through difficult topography in many places and was largely routed along the sea and through the towns.
The route was initially electrified with three-phase current, later planned as V 25,000/50 Hz, and then finally in 1964/1967 it was supplied with FS DC 3000.
But by this time the single-track route along the sea was no longer sufficient to cope with the increasing traffic, so the first new routes were built in the Genova area at the end of the 1960s. In 1977, the Varazzo - Finale Ligure section was the first longer new construction section. Over time, others followed further west, but in Finale Ligure the first new section now meets the last original section. This is also the motif of the pictures from Finalie Ligure, here the FS Trenitalia IC 631 leaves the single-lane, 1136 meter long "Galleria Caprazoppa".
Photo location: end of platform)
September 16, 2023

Stefan Wohlfahrt http://klein-aber-fein---imagination.startbilder.de/ 01.10.2023, 304 Visningar, 0 Kommentarer · automatiskt översatt

EXIF: SONY ILCA-77M2, Datum 2023:09:16 09:30:30, Exponeringstid: 1/500, Bländare: 50/10, ISO160, Brännvidd: 500/10

0 Kommentarer, Alla kommentarer
FS Trenitalia ETR 500 013, som trafikerar som Frecciarossa 8506, väntar på avgång till Bolzano vid Roma Termini.

23 mars 2026
FS Trenitalia ETR 500 013, som trafikerar som Frecciarossa 8506, väntar på avgång till Bolzano vid Roma Termini. 23 mars 2026
Stefan Wohlfahrt

Italien / Elektriska multipel­enheter / ETR 500

183 1400x913 Px, 27.03.2026

FS Trenitalia ETR 500 052 väntar på Milano Centrale för sin omedelbara avgång (från 14:30) till Reggio di Calabria Centrale, där tåget anländer kl. 23:53 efter en lång resa på över 1 250 km. Vi reste också till södra Italien, men vår rutt tog oss längs en något annorlunda väg... 

27 februari 2026
FS Trenitalia ETR 500 052 väntar på Milano Centrale för sin omedelbara avgång (från 14:30) till Reggio di Calabria Centrale, där tåget anländer kl. 23:53 efter en lång resa på över 1 250 km. Vi reste också till södra Italien, men vår rutt tog oss längs en något annorlunda väg... 27 februari 2026
Stefan Wohlfahrt

Italien / Elektriska multipel­enheter / ETR 500

206 1400x954 Px, 26.03.2026

RFI ETR 500 och en Trenord ETR 104 (POP) på Milano Centrale station. 

17.09.2025
RFI ETR 500 och en Trenord ETR 104 (POP) på Milano Centrale station. 17.09.2025
Stefan Wohlfahrt

ETR 500 höghastighetståg anländer till Ferrara station. 8 maj 2025
ETR 500 höghastighetståg anländer till Ferrara station. 8 maj 2025
De Rond Hans und Jeanny






Statistik
 
Diese Webseite verwendet Cookies, um Inhalte und Anzeigen zu personalisieren und Zugriffe zu analysieren. Sie können zwischen personalisierter und nicht-personalisierter Werbung wählen.
Mit der Nutzung dieser Seite stimmen Sie der Verwendung von Cookies zu.