rail-pictures.com
No registration required - login with Google, Facebook or X account! Hello guest, you are not logged in. Log in | Create account 
Forum   Contact   Legal notice
English German French Italian Spanish Polish Dutch 

When one of the most beautiful sections of the Genova - Ventimiglia route near Cervia was replaced by a tunnel variant a few years ago, numerous photographers arrived in advance.

(ID 50440)



When one of the most beautiful sections of the Genova - Ventimiglia route near Cervia was replaced by a tunnel variant a few years ago, numerous photographers arrived in advance.
The Genova - Savona route opened in 1868. The Savona Ventimiglia continuation, which went into operation in 1972, led through difficult topography in many places and was largely routed along the sea and through the towns.
The route was initially electrified with three-phase current, later planned as V 25,000/50 Hz, and then finally in 1964/1967 it was supplied with FS DC 3000.
But by this time the single-track route along the sea was no longer sufficient to cope with the increasing traffic, so the first new routes were built in the Genova area at the end of the 1960s. In 1977, the Varazzo - Finale Ligure section was the first longer new construction section. Over time, others followed further west, but in Finale Ligure the first new section now meets the last original section. This is also the motif of the pictures from Finalie Ligure, here the FS Trenitalia IC 631 leaves the single-lane, 1136 meter long  Galleria Caprazoppa .
Photo location: end of platform)
September 16, 2023

When one of the most beautiful sections of the Genova - Ventimiglia route near Cervia was replaced by a tunnel variant a few years ago, numerous photographers arrived in advance.
The Genova - Savona route opened in 1868. The Savona Ventimiglia continuation, which went into operation in 1972, led through difficult topography in many places and was largely routed along the sea and through the towns.
The route was initially electrified with three-phase current, later planned as V 25,000/50 Hz, and then finally in 1964/1967 it was supplied with FS DC 3000.
But by this time the single-track route along the sea was no longer sufficient to cope with the increasing traffic, so the first new routes were built in the Genova area at the end of the 1960s. In 1977, the Varazzo - Finale Ligure section was the first longer new construction section. Over time, others followed further west, but in Finale Ligure the first new section now meets the last original section. This is also the motif of the pictures from Finalie Ligure, here the FS Trenitalia IC 631 leaves the single-lane, 1136 meter long "Galleria Caprazoppa".
Photo location: end of platform)
September 16, 2023

Stefan Wohlfahrt http://klein-aber-fein---imagination.startbilder.de/ 01.10.2023, 149 Views, 0 Comments

EXIF: SONY ILCA-77M2, Date 2023:09:16 09:30:30, Exposure time: 1/500, Aperture: 50/10, ISO160, Focal length: 500/10

0 Comments, All comments
Write a comment
The FS Trenitalia ETR 500 013, operating as Frecciarossa 8506, awaits departure to Bolzano at Roma Termini.

March 23, 2026
The FS Trenitalia ETR 500 013, operating as Frecciarossa 8506, awaits departure to Bolzano at Roma Termini. March 23, 2026
Stefan Wohlfahrt

Italy / Electric multiple units / ETR 500

21 1400x913 Px, 27.03.2026

The FS Trenitalia ETR 500 052 is waiting at Milano Centrale for its imminent departure (from 14:30) to Reggio di Calabria Centrale, where the train will arrive at 23:53 after a long journey of over 1,250 km. We too were travelling to southern Italy, but our route took us along a slightly different path... 

27 February 2026
The FS Trenitalia ETR 500 052 is waiting at Milano Centrale for its imminent departure (from 14:30) to Reggio di Calabria Centrale, where the train will arrive at 23:53 after a long journey of over 1,250 km. We too were travelling to southern Italy, but our route took us along a slightly different path... 27 February 2026
Stefan Wohlfahrt

Italy / Electric multiple units / ETR 500

30 1400x954 Px, 26.03.2026

The RFI ETR 500 and a Trenord ETR 104 (POP) in the Milano Centrale Station. 

17.09.2025
The RFI ETR 500 and a Trenord ETR 104 (POP) in the Milano Centrale Station. 17.09.2025
Stefan Wohlfahrt

ETR 500 high-speed train arrives at Ferrara station. May 8th, 2025
ETR 500 high-speed train arrives at Ferrara station. May 8th, 2025
De Rond Hans und Jeanny






Statistik
 
Diese Webseite verwendet Cookies, um Inhalte und Anzeigen zu personalisieren und Zugriffe zu analysieren. Sie können zwischen personalisierter und nicht-personalisierter Werbung wählen.
Mit der Nutzung dieser Seite stimmen Sie der Verwendung von Cookies zu.