The Blonay Chamby Bernina Bahn Ge 4/4 81 with his train on the way to Blonay on the Baye de Clarnes Viadukt.

(ID 41475)



The Blonay Chamby Bernina Bahn Ge 4/4 81 with his train on the way to Blonay on the Baye de Clarnes Viadukt.  

11.10.2020

The Blonay Chamby Bernina Bahn Ge 4/4 81 with his train on the way to Blonay on the Baye de Clarnes Viadukt.

11.10.2020

Stefan Wohlfahrt http://klein-aber-fein---imagination.startbilder.de/ 11.10.2020, 164 Aufrufe, 0 Kommentare

EXIF: SONY ILCA-77M2, Datum 2020:10:11 15:53:56, Belichtungsdauer: 1/160, Blende: 80/10, ISO250, Brennweite: 180/10

0 Kommentare, Alle Kommentare
Kommentar verfassen
Shortly before the start of the renovation work on the Baye de Clarens Viaduct, the BOB HGe 3/3 29 is hauling a short passenger train near Vers Chez Rober on its way to Blonay.

October 27, 2019
Shortly before the start of the renovation work on the Baye de Clarens Viaduct, the BOB HGe 3/3 29 is hauling a short passenger train near Vers Chez Rober on its way to Blonay. October 27, 2019
Stefan Wohlfahrt

Construction work has begun and is urgently needed, as the mountain is pushing from the Blonay side toward Chamby. This will deform the viaduct and subsequently degrade it.

August 13, 2023
Construction work has begun and is urgently needed, as the mountain is pushing from the Blonay side toward Chamby. This will deform the viaduct and subsequently degrade it. August 13, 2023
Stefan Wohlfahrt

During the renovation work on the Bay de Clarens Viaduct, the museum's railway service was maintained, and this photo was taken.

May 4, 2024
During the renovation work on the Bay de Clarens Viaduct, the museum's railway service was maintained, and this photo was taken. May 4, 2024
Stefan Wohlfahrt

The complex renovation work on the Baye de Clarens Viaduct has been completed. To withstand the constant pressure of the mountain, a pier on the Blonay side was designed so that the viaduct slides  flexibly  and only needs to be readjusted in 20 to 25 years.
Pictured here is the SEG G 2x 2/2 105 of the Blonay Chamby Railway on its way to Chaulin.
May 18, 2024
The complex renovation work on the Baye de Clarens Viaduct has been completed. To withstand the constant pressure of the mountain, a pier on the Blonay side was designed so that the viaduct slides "flexibly" and only needs to be readjusted in 20 to 25 years. Pictured here is the SEG G 2x 2/2 105 of the Blonay Chamby Railway on its way to Chaulin. May 18, 2024
Stefan Wohlfahrt