rail-pictures.com
No registration required - use your Google-, Facebook- or X- account to log in! Hola invitado, no ha iniciado sesión. Iniciar sesión | Cuenta anmelden 
Foro   Contacto   Impressum
inglés alemán francés italiano español polaco neerlandés mandarín / chino indisch 

The Blonay-Chamby G 3/3 N° 5 (LEB) and the RhB ABe 4/4 35 wiht the Riviera Belle Epoque Service from Vevey to Chaulin in St Legier Gare.

(ID 41329)



The Blonay-Chamby G 3/3 N° 5 (LEB) and the RhB ABe 4/4 35 wiht the Riviera Belle Epoque Service from Vevey to Chaulin in St Legier Gare. 

27.09.2020

The Blonay-Chamby G 3/3 N° 5 (LEB) and the RhB ABe 4/4 35 wiht the Riviera Belle Epoque Service from Vevey to Chaulin in St Legier Gare.

27.09.2020

Stefan Wohlfahrt http://klein-aber-fein---imagination.startbilder.de/ 27.09.2020, 168 Llamadas, 0 Comentarios

EXIF: SONY ILCA-77M2, Dato 2020:09:27 10:50:50, Tiempo de exposición: 1/400, Blenda: 63/10, ISO250, Distancia focal: 220/10

0 Comentarios, Todos los comentarios
Escribir un comentario
Shortly before the start of the renovation work on the Baye de Clarens Viaduct, the BOB HGe 3/3 29 is hauling a short passenger train near Vers Chez Rober on its way to Blonay.

October 27, 2019
Shortly before the start of the renovation work on the Baye de Clarens Viaduct, the BOB HGe 3/3 29 is hauling a short passenger train near Vers Chez Rober on its way to Blonay. October 27, 2019
Stefan Wohlfahrt

Construction work has begun and is urgently needed, as the mountain is pushing from the Blonay side toward Chamby. This will deform the viaduct and subsequently degrade it.

August 13, 2023
Construction work has begun and is urgently needed, as the mountain is pushing from the Blonay side toward Chamby. This will deform the viaduct and subsequently degrade it. August 13, 2023
Stefan Wohlfahrt

During the renovation work on the Bay de Clarens Viaduct, the museum's railway service was maintained, and this photo was taken.

May 4, 2024
During the renovation work on the Bay de Clarens Viaduct, the museum's railway service was maintained, and this photo was taken. May 4, 2024
Stefan Wohlfahrt

The complex renovation work on the Baye de Clarens Viaduct has been completed. To withstand the constant pressure of the mountain, a pier on the Blonay side was designed so that the viaduct slides  flexibly  and only needs to be readjusted in 20 to 25 years.
Pictured here is the SEG G 2x 2/2 105 of the Blonay Chamby Railway on its way to Chaulin.
May 18, 2024
The complex renovation work on the Baye de Clarens Viaduct has been completed. To withstand the constant pressure of the mountain, a pier on the Blonay side was designed so that the viaduct slides "flexibly" and only needs to be readjusted in 20 to 25 years. Pictured here is the SEG G 2x 2/2 105 of the Blonay Chamby Railway on its way to Chaulin. May 18, 2024
Stefan Wohlfahrt