rail-pictures.com
No registration required - login with Google, Facebook or X account! Hello guest, you are not logged in. Log in | Create account 
Forum   Contact   Legal notice
English German French Italian Spanish Polish Dutch japanisch Swedish 

Photos by Laurin Gehrig

12 Photos
Ge 4/4 II 614  Schiers  pulls AGZ as IR38 to SMOR between Felsberg and Chur on 11.4.2026
Ge 4/4 II 614 "Schiers" pulls AGZ as IR38 to SMOR between Felsberg and Chur on 11.4.2026
Laurin Gehrig

Ge 4/4 II 627  Reichenau-Tamins  with Glacier Express 905 shortly before Chur West on 11.4.2026
Ge 4/4 II 627 "Reichenau-Tamins" with Glacier Express 905 shortly before Chur West on 11.4.2026
Laurin Gehrig

RBDe 566 222 and BDe 4/4 II 201 as EXT at Palezieux
RBDe 566 222 and BDe 4/4 II 201 as EXT at Palezieux
Laurin Gehrig

Switzerland / Electric multiple units / RBDe 566

13 1200x801 Px, 04.06.2026

Ge4/4 III 643  Vals  with IR38 at Bergün/Bravuogn on 24.5.2026
Ge4/4 III 643 "Vals" with IR38 at Bergün/Bravuogn on 24.5.2026
Laurin Gehrig

ABe 4/4 I 30 with special train above Stablini on 30.5.2026
ABe 4/4 I 30 with special train above Stablini on 30.5.2026
Laurin Gehrig

ABe 4/4 I 30 with special train at the departure from the Stablini crossing point on 30.5.2026
ABe 4/4 I 30 with special train at the departure from the Stablini crossing point on 30.5.2026
Laurin Gehrig

Train crossing between ABe 4/16 as R19 to Tirano and ABe 4/4 I 30 with special train to Pontresina at the Stablini crossing point on 30.5.2026
Train crossing between ABe 4/16 as R19 to Tirano and ABe 4/4 I 30 with special train to Pontresina at the Stablini crossing point on 30.5.2026
Laurin Gehrig

Due to a defect on ABe 4/4 I 34, the EXT was delayed by 80 minutes and shortened with ABe 4/4 I 30 to Cavaglia on 30.5.2026 (since my planned spot was in the shade because of the delay, I had to improvise)
Due to a defect on ABe 4/4 I 34, the EXT was delayed by 80 minutes and shortened with ABe 4/4 I 30 to Cavaglia on 30.5.2026 (since my planned spot was in the shade because of the delay, I had to improvise)
Laurin Gehrig

Due to a defect on ABe 4/4 I 34, the EXT was delayed by 80 minutes and shortened with ABe 4/4 I 30 at Cavaglia on 30.5.2026 (since my planned spot was in the shade because of the delay, I had to improvise)
Due to a defect on ABe 4/4 I 34, the EXT was delayed by 80 minutes and shortened with ABe 4/4 I 30 at Cavaglia on 30.5.2026 (since my planned spot was in the shade because of the delay, I had to improvise)
Laurin Gehrig

Ge4/4 III 6xx  Vals  with IR38 at Bergün/Bravuogn on 24.5.2026
Ge4/4 III 6xx "Vals" with IR38 at Bergün/Bravuogn on 24.5.2026
Laurin Gehrig

G 4/5 107  Albula  with special train near Malans on 23.5.2026
G 4/5 107 "Albula" with special train near Malans on 23.5.2026
Laurin Gehrig

Switzerland / Rhaetian railway (RhB) / Prättigau

13 1200x801 Px, 04.06.2026

Double steam train with 241.A.65 & 141.R.1244 near Bollodingen
Double steam train with 241.A.65 & 141.R.1244 near Bollodingen
Laurin Gehrig

Switzerland / Steam locomotives / Various

18 1200x801 Px, 04.06.2026






Statistik
 
Diese Webseite verwendet Cookies, um Inhalte und Anzeigen zu personalisieren und Zugriffe zu analysieren. Sie können zwischen personalisierter und nicht-personalisierter Werbung wählen.
Mit der Nutzung dieser Seite stimmen Sie der Verwendung von Cookies zu.