Due to a defect on ABe 4/4 I 34, the EXT was delayed by 80 minutes and shortened with ABe 4/4 I 30 at Cavaglia on 30.5.2026 (since my planned spot was in the shade because of the delay, I had to improvise)
Laurin Gehrig 04.06.2026, 102 Views, 0 Comments
112 1400x928 Px, 21.06.2026
105 1400x962 Px, 21.06.2026
106 1200x801 Px, 04.06.2026
99 1200x801 Px, 04.06.2026