rail-pictures.com
No registration required - use your Google-, Facebook- or X- account to log in! Hallo Gast, Sie sind nicht eingeloggt. Einloggen | Account anmelden 
Forum   Kontakt   Impressum
englisch deutsch französisch italienisch spanisch polnisch niederländisch mandarin / chinesisch indisch 

Several trams are running through the Gemeentestraat in Antwerp on September 13th, 2008.

(ID 10014)



Several trams are running through the Gemeentestraat in Antwerp on September 13th, 2008.

Several trams are running through the Gemeentestraat in Antwerp on September 13th, 2008.

De Rond Hans und Jeanny http://wwwfotococktail-revival.startbilder.de 19.02.2012, 630 Aufrufe, 0 Kommentare

0 Kommentare, Alle Kommentare
Kommentar verfassen
De Lijn 7435 CAF Urbos 100 build in 2023.
Line 10 P+R Schoonselhof.
Location: End station Wijnegem Fortveld.
05-03-2025
De Lijn 7435 CAF Urbos 100 build in 2023. Line 10 P+R Schoonselhof. Location: End station Wijnegem Fortveld. 05-03-2025
Mark Min

Belgium / Trams / Tram Antwerp

36 1200x800 Px, 14.03.2025

De Lijn 7357 Bombardier Flexity 2 XL (43m) build in 2018.
Line 15 Regatta
Location: metro station Van Eeden.
27-02-2025
De Lijn 7357 Bombardier Flexity 2 XL (43m) build in 2018. Line 15 Regatta Location: metro station Van Eeden. 27-02-2025
Mark Min

Belgium / Trams / Tram Antwerp

33 1200x800 Px, 14.03.2025

De Lijn 7321 Bombardier Flexity 2 build in 2015.
Line 26 Silsburg via Berchem Station.
Location: Borsbeeksebrug.
This was a temporary line, due to maintenance works in the metro tunnels between stations Opera and Van Eeden lines 3-5-9 and 15 were not operated on Sunday 09-03-2025. Instead there where 2 temporary lines:
Line 25: P+R Merksem – P+R Boechout (combination of 3 and 15).
Line 26: Wijnegem – Silsburg (combination of 5 nand 9).
These lines served metro stations: Plantin – Diamant – Astrid – Elisabeth – Handel – Schijnpoort and Sport(only line 25).
09-03-2025
De Lijn 7321 Bombardier Flexity 2 build in 2015. Line 26 Silsburg via Berchem Station. Location: Borsbeeksebrug. This was a temporary line, due to maintenance works in the metro tunnels between stations Opera and Van Eeden lines 3-5-9 and 15 were not operated on Sunday 09-03-2025. Instead there where 2 temporary lines: Line 25: P+R Merksem – P+R Boechout (combination of 3 and 15). Line 26: Wijnegem – Silsburg (combination of 5 nand 9). These lines served metro stations: Plantin – Diamant – Astrid – Elisabeth – Handel – Schijnpoort and Sport(only line 25). 09-03-2025
Mark Min

Belgium / Trams / Tram Antwerp

31 1200x800 Px, 14.03.2025

De Lijn 7362 Bombardier Flexity 2 XL (43m) build in 2018.
Line 25 P+R Boechout.
Location: End station P+R Merksem.
This was a temporary line, due to maintenance works in the metro tunnels between stations Opera and Van Eeden lines 3-5-9 and 15 were not operated on Sunday 09-03-2025. Instead there where 2 temporary lines:
Line 25: P+R Merksem – P+R Boechout (combination of 3 and 15).
Line 26: Wijnegem – Silsburg (combination of 5 nand 9).
These lines served metro stations: Plantin – Diamant – Astrid – Elisabeth – Handel – Schijnpoort and Sport(only line 25).
09-03-2025
De Lijn 7362 Bombardier Flexity 2 XL (43m) build in 2018. Line 25 P+R Boechout. Location: End station P+R Merksem. This was a temporary line, due to maintenance works in the metro tunnels between stations Opera and Van Eeden lines 3-5-9 and 15 were not operated on Sunday 09-03-2025. Instead there where 2 temporary lines: Line 25: P+R Merksem – P+R Boechout (combination of 3 and 15). Line 26: Wijnegem – Silsburg (combination of 5 nand 9). These lines served metro stations: Plantin – Diamant – Astrid – Elisabeth – Handel – Schijnpoort and Sport(only line 25). 09-03-2025
Mark Min

Belgium / Trams / Tram Antwerp

35 1200x800 Px, 14.03.2025






Statistik
 
Diese Webseite verwendet Cookies, um Inhalte und Anzeigen zu personalisieren und Zugriffe zu analysieren. Sie können zwischen personalisierter und nicht-personalisierter Werbung wählen.
Mit der Nutzung dieser Seite stimmen Sie der Verwendung von Cookies zu.