rail-pictures.com Linie rail-pictures.com
Keine Registrierung nötig - Login mit Google-, Facebook- or X-Account! Hello guest, you are not logged in. Log in | Create account 
Forum   Contact   Legal notice
English German French Italian Spanish Polish Dutch japanisch Swedish 

De Lijn 7048 BN PCC build in 1962.

(ID 26998)


De Lijn 7048 BN PCC build in 1962. Carnotstraat, Antwerpen 31-10-2014.

De Lijn 7048 BN PCC build in 1962. Carnotstraat, Antwerpen 31-10-2014.

Hans van der Sluis http://interessante-bilder.startbilder.de 09.04.2016, 936 Views, 0 Comments

0 Comments, All comments
De Lijn 7435 CAF Urbos 100 build in 2023.
Line 10 P+R Schoonselhof.
Location: End station Wijnegem Fortveld.
05-03-2025
De Lijn 7435 CAF Urbos 100 build in 2023. Line 10 P+R Schoonselhof. Location: End station Wijnegem Fortveld. 05-03-2025
Mark Min

Belgium / Trams / Tram Antwerp

530 1200x800 Px, 14.03.2025

De Lijn 7357 Bombardier Flexity 2 XL (43m) build in 2018.
Line 15 Regatta
Location: metro station Van Eeden.
27-02-2025
De Lijn 7357 Bombardier Flexity 2 XL (43m) build in 2018. Line 15 Regatta Location: metro station Van Eeden. 27-02-2025
Mark Min

Belgium / Trams / Tram Antwerp

424 1200x800 Px, 14.03.2025

De Lijn 7321 Bombardier Flexity 2 build in 2015.
Line 26 Silsburg via Berchem Station.
Location: Borsbeeksebrug.
This was a temporary line, due to maintenance works in the metro tunnels between stations Opera and Van Eeden lines 3-5-9 and 15 were not operated on Sunday 09-03-2025. Instead there where 2 temporary lines:
Line 25: P+R Merksem – P+R Boechout (combination of 3 and 15).
Line 26: Wijnegem – Silsburg (combination of 5 nand 9).
These lines served metro stations: Plantin – Diamant – Astrid – Elisabeth – Handel – Schijnpoort and Sport(only line 25).
09-03-2025
De Lijn 7321 Bombardier Flexity 2 build in 2015. Line 26 Silsburg via Berchem Station. Location: Borsbeeksebrug. This was a temporary line, due to maintenance works in the metro tunnels between stations Opera and Van Eeden lines 3-5-9 and 15 were not operated on Sunday 09-03-2025. Instead there where 2 temporary lines: Line 25: P+R Merksem – P+R Boechout (combination of 3 and 15). Line 26: Wijnegem – Silsburg (combination of 5 nand 9). These lines served metro stations: Plantin – Diamant – Astrid – Elisabeth – Handel – Schijnpoort and Sport(only line 25). 09-03-2025
Mark Min

Belgium / Trams / Tram Antwerp

501 1200x800 Px, 14.03.2025

De Lijn 7362 Bombardier Flexity 2 XL (43m) build in 2018.
Line 25 P+R Boechout.
Location: End station P+R Merksem.
This was a temporary line, due to maintenance works in the metro tunnels between stations Opera and Van Eeden lines 3-5-9 and 15 were not operated on Sunday 09-03-2025. Instead there where 2 temporary lines:
Line 25: P+R Merksem – P+R Boechout (combination of 3 and 15).
Line 26: Wijnegem – Silsburg (combination of 5 nand 9).
These lines served metro stations: Plantin – Diamant – Astrid – Elisabeth – Handel – Schijnpoort and Sport(only line 25).
09-03-2025
De Lijn 7362 Bombardier Flexity 2 XL (43m) build in 2018. Line 25 P+R Boechout. Location: End station P+R Merksem. This was a temporary line, due to maintenance works in the metro tunnels between stations Opera and Van Eeden lines 3-5-9 and 15 were not operated on Sunday 09-03-2025. Instead there where 2 temporary lines: Line 25: P+R Merksem – P+R Boechout (combination of 3 and 15). Line 26: Wijnegem – Silsburg (combination of 5 nand 9). These lines served metro stations: Plantin – Diamant – Astrid – Elisabeth – Handel – Schijnpoort and Sport(only line 25). 09-03-2025
Mark Min

Belgium / Trams / Tram Antwerp

447 1200x800 Px, 14.03.2025