rail-pictures.com Linie rail-pictures.com
No registration required - login with Google, Facebook or X account! Hello guest, you are not logged in. Log in | Create account 
Forum   Contact   Legal notice
English German French Italian Spanish Polish Dutch japanisch Swedish 

BLM Be 4/4 31 is traveling between Grütschalp and Winteregg, on its way to Mürren.

(ID 59800)


BLM Be 4/4 31 is traveling between Grütschalp and Winteregg, on its way to Mürren.

Aug 24, 2024

BLM Be 4/4 31 is traveling between Grütschalp and Winteregg, on its way to Mürren.

Aug 24, 2024

Stefan Wohlfahrt http://klein-aber-fein---imagination.startbilder.de/ 16.11.2026, 0 Views, 0 Comments

EXIF: SONY ILCA-77M2, Date 2024:08:08 10:29:50, Exposure time: 1/400, Aperture: 80/10, ISO100, Focal length: 500/10

0 Comments, All comments
With the replacement of the Be 4/4 21–23 and 31 units—previously used on the BLM—the power supply system was also changed; the new Be 4/6 101–103 units operate at a higher voltage. For one brief summer, however, both series of trainsets operated concurrently, with the new Be 4/6 units running on a lower voltage and, consequently, at reduced power.

A BLM Be 4/4 departs from Winteregg.

Aug 8, 2024
With the replacement of the Be 4/4 21–23 and 31 units—previously used on the BLM—the power supply system was also changed; the new Be 4/6 101–103 units operate at a higher voltage. For one brief summer, however, both series of trainsets operated concurrently, with the new Be 4/6 units running on a lower voltage and, consequently, at reduced power. A BLM Be 4/4 departs from Winteregg. Aug 8, 2024
Stefan Wohlfahrt

With the replacement of the Be 4/4 21–23 and 31 units—previously used on the BLM—the power supply system was also changed; the new Be 4/6 101–103 units operate at a higher voltage. For one brief summer, however, both series of railcars operated side by side, with the new Be 4/6 units running at a lower voltage and, consequently, reduced power output.

At Winteregg, the BLM Be 4/4 31 passes a new, colorfully livery-clad Be 4/6.

Aug 8, 2024
With the replacement of the Be 4/4 21–23 and 31 units—previously used on the BLM—the power supply system was also changed; the new Be 4/6 101–103 units operate at a higher voltage. For one brief summer, however, both series of railcars operated side by side, with the new Be 4/6 units running at a lower voltage and, consequently, reduced power output. At Winteregg, the BLM Be 4/4 31 passes a new, colorfully livery-clad Be 4/6. Aug 8, 2024
Stefan Wohlfahrt

After I had waited for a while, one of the first new Be 4/6 units arrived from the direction of Grütschalp. It will reach Mürren shortly.

July 23, 2024
After I had waited for a while, one of the first new Be 4/6 units arrived from the direction of Grütschalp. It will reach Mürren shortly. July 23, 2024
Stefan Wohlfahrt

Also shortly before reaching Mürren, the BLM Be 4/4 21 comes into view. 
The railcar is on its way from Grütschalp to Mürren. 

July 23, 2024
Also shortly before reaching Mürren, the BLM Be 4/4 21 comes into view. The railcar is on its way from Grütschalp to Mürren. July 23, 2024
Stefan Wohlfahrt