For one summer there was "mixed operation" on the BLM, i.e.

(ID 53198)


For one summer there was  mixed operation  on the BLM, i.e. the new and old trains ran together, with the new Be 4/6 being used with reduced performance due to low voltage. The picture was taken in Mürren, while the Be 4/6 102  Mönch  has just arrived, the Be 4/4 31  Lisi  is leaving the station towards Grütschalp. 

July 23, 2024

For one summer there was "mixed operation" on the BLM, i.e. the new and old trains ran together, with the new Be 4/6 being used with reduced performance due to low voltage. The picture was taken in Mürren, while the Be 4/6 102 "Mönch" has just arrived, the Be 4/4 31 "Lisi" is leaving the station towards Grütschalp.

July 23, 2024

Stefan Wohlfahrt http://klein-aber-fein---imagination.startbilder.de/ 17.11.2024, 522 Views, 0 Comments

EXIF: SONY ILCA-77M2, Date 2024:07:23 11:14:46, Exposure time: 1/160, Aperture: 50/10, ISO400, Focal length: 240/10

0 Comments, All comments
With the replacement of the Be 4/4 21–23 and 31 units—previously used on the BLM—the power supply system was also changed; the new Be 4/6 101–103 units operate at a higher voltage. For one brief summer, however, both series of trainsets operated concurrently, with the new Be 4/6 units running on a lower voltage and, consequently, at reduced power.

A BLM Be 4/4 departs from Winteregg.

Aug 8, 2024
With the replacement of the Be 4/4 21–23 and 31 units—previously used on the BLM—the power supply system was also changed; the new Be 4/6 101–103 units operate at a higher voltage. For one brief summer, however, both series of trainsets operated concurrently, with the new Be 4/6 units running on a lower voltage and, consequently, at reduced power. A BLM Be 4/4 departs from Winteregg. Aug 8, 2024
Stefan Wohlfahrt

With the replacement of the Be 4/4 21–23 and 31 units—previously used on the BLM—the power supply system was also changed; the new Be 4/6 101–103 units operate at a higher voltage. For one brief summer, however, both series of railcars operated side by side, with the new Be 4/6 units running at a lower voltage and, consequently, reduced power output.

At Winteregg, the BLM Be 4/4 31 passes a new, colorfully livery-clad Be 4/6.

Aug 8, 2024
With the replacement of the Be 4/4 21–23 and 31 units—previously used on the BLM—the power supply system was also changed; the new Be 4/6 101–103 units operate at a higher voltage. For one brief summer, however, both series of railcars operated side by side, with the new Be 4/6 units running at a lower voltage and, consequently, reduced power output. At Winteregg, the BLM Be 4/4 31 passes a new, colorfully livery-clad Be 4/6. Aug 8, 2024
Stefan Wohlfahrt

After I had waited for a while, one of the first new Be 4/6 units arrived from the direction of Grütschalp. It will reach Mürren shortly.

July 23, 2024
After I had waited for a while, one of the first new Be 4/6 units arrived from the direction of Grütschalp. It will reach Mürren shortly. July 23, 2024
Stefan Wohlfahrt

Also shortly before reaching Mürren, the BLM Be 4/4 21 comes into view. 
The railcar is on its way from Grütschalp to Mürren. 

July 23, 2024
Also shortly before reaching Mürren, the BLM Be 4/4 21 comes into view. The railcar is on its way from Grütschalp to Mürren. July 23, 2024