Construction work has begun and is urgently needed, as the mountain is pushing from the Blonay side toward Chamby.

(ID 54827)



Construction work has begun and is urgently needed, as the mountain is pushing from the Blonay side toward Chamby. This will deform the viaduct and subsequently degrade it.

August 13, 2023

Construction work has begun and is urgently needed, as the mountain is pushing from the Blonay side toward Chamby. This will deform the viaduct and subsequently degrade it.

August 13, 2023

Stefan Wohlfahrt http://klein-aber-fein---imagination.startbilder.de/ 19.07.2025, 2 Calls, 0 Comments

EXIF: SONY ILCA-77M2, Date 2023:08:13 15:53:43, Exposure time: 1/320, Blend: 90/10, ISO160, Focal length: 200/10

0 Comments, All comments
Write a comment
Shortly before the start of the renovation work on the Baye de Clarens Viaduct, the BOB HGe 3/3 29 is hauling a short passenger train near Vers Chez Rober on its way to Blonay.

October 27, 2019
Shortly before the start of the renovation work on the Baye de Clarens Viaduct, the BOB HGe 3/3 29 is hauling a short passenger train near Vers Chez Rober on its way to Blonay. October 27, 2019
Stefan Wohlfahrt

During the renovation work on the Bay de Clarens Viaduct, the museum's railway service was maintained, and this photo was taken.

May 4, 2024
During the renovation work on the Bay de Clarens Viaduct, the museum's railway service was maintained, and this photo was taken. May 4, 2024
Stefan Wohlfahrt

The complex renovation work on the Baye de Clarens Viaduct has been completed. To withstand the constant pressure of the mountain, a pier on the Blonay side was designed so that the viaduct slides  flexibly  and only needs to be readjusted in 20 to 25 years.
Pictured here is the SEG G 2x 2/2 105 of the Blonay Chamby Railway on its way to Chaulin.
May 18, 2024
The complex renovation work on the Baye de Clarens Viaduct has been completed. To withstand the constant pressure of the mountain, a pier on the Blonay side was designed so that the viaduct slides "flexibly" and only needs to be readjusted in 20 to 25 years. Pictured here is the SEG G 2x 2/2 105 of the Blonay Chamby Railway on its way to Chaulin. May 18, 2024
Stefan Wohlfahrt

The SEG G 2x 2/2 105 by the Blonay Chamby Railway is now supplied with water and coal and returns to the museum station to take the next train to Blonay.

June 6, 2024
The SEG G 2x 2/2 105 by the Blonay Chamby Railway is now supplied with water and coal and returns to the museum station to take the next train to Blonay. June 6, 2024
Stefan Wohlfahrt






Statistik
 
Diese Webseite verwendet Cookies, um Inhalte und Anzeigen zu personalisieren und Zugriffe zu analysieren. Sie können zwischen personalisierter und nicht-personalisierter Werbung wählen.
Mit der Nutzung dieser Seite stimmen Sie der Verwendung von Cookies zu.