Due to construction work on the Vevey-Lausanne line, trains were rerouted via the "Train des Vignes" line. The picture shows the end and, somewhat distantly, the head of the train of an SBB IR on the journey from Vevey to Lausanne via Palézieux at the 20 meter long Salanfe Tunnel above St-Saphorin.
March 20, 2022
Stefan Wohlfahrt http://klein-aber-fein---imagination.startbilder.de/ 07.11.2023, 28 views, 0 comments
EXIF: SONY ILCA-77M2, Date 2022:03:20 12:47:51, Exposure time: 1/640, Aperture: 56/10, ISO80, Focal length: 450/10
37 1200x778 Px, 19.01.2024
47 1200x797 Px, 04.12.2023
48 1200x745 Px, 11.11.2023
52 1200x869 Px, 07.11.2023