De Lijn 7354 Bombardier Flexity 2 XL (43m) build in 2017.
Line 25 P+R Boechout.
Location: End station P+R Merksem.
This was a temporary line, due to maintenance works in the metro tunnels between stations Opera and Van Eeden lines 3-5-9 and 15 were not operated on Sunday 09-03-2025. Instead there where 2 temporary lines:
Line 25: P+R Merksem – P+R Boechout (combination of 3 and 15).
Line 26: Wijnegem – Silsburg (combination of 5 nand 9).
These lines served metro stations: Plantin – Diamant – Astrid – Elisabeth – Handel – Schijnpoort and Sport(only line 25).
09-03-2025
Mark Min 13.03.2025, 117 Visualizzazioni, 0 Commenti
EXIF: Panasonic DMC-FZ2000, Data 2025:03:09 14:34:11, Tempo di esposizione: 10/5000, Blenda: 71/10, ISO125, Lunghezza focale: 88/10
163 1200x800 Px, 14.03.2025
135 1200x800 Px, 14.03.2025
134 1200x800 Px, 14.03.2025
131 1200x800 Px, 14.03.2025