ÖBB/RCC 1293 196 hauls a steel train through Valburg toward Beverwijk on 14 April 2026.
(ID 57330)
ÖBB/RCC 1293 196 hauls a steel train through Valburg toward Beverwijk on 14 April 2026. ÖBB/RCC Vectrons are a common sight on Dutch tracks in freight traffic after ÖBB/RCC bought Captrain Netherlands in January 2026.
Leonardus Schrijvers 26.04.2026, 276 Views, 0 Comments
0 Comments, All comments
The OBB 1293 160 with a tank train on route to the port of Antwerp. Siemens Vectron MS build in 2026 with construction N° 24317. Line 27A at Antwerp Airport. 15-09-2026
Mark Min
Mark Min
Austria / Electric locomotives / 1293
88 1600x1066 Px, 20.09.2026
Austria / Electric locomotives / 1293
192 1200x800 Px, 18.06.2026
Austria / Electric locomotives / 1293
171 1200x800 Px, 04.06.2026
On 27 April 2026 RC/ÖBB 1293 185 hauls a sister loco and a coal train slowly through Lage Zwaluwe towards Venlo and Germany. Since RCC took over Captrain Netherlands, the deployment of ÖBB Vectrons Class 1293 in the Netherlands has increased massively.
Leonardus Schrijvers
Leonardus Schrijvers
Austria / Electric locomotives / 1293
371 1200x800 Px, 29.04.2026








