rail-pictures.com
Ingen registrering krävs - logga in med Google-, Facebook- eller X-konto! Hej gäst, du är inte inloggad. Logga in | Skapa konto 
Forum   Kontakt   Impressum
engelska tyska franska italienska spanska polska nederländska japanisch svenska 

172 Bilder
<<  föregående sida  1 2 3 4 5 6 7 8 nästa sida  >>
De Lijn 7358 Bombardier Flexity 2 XL(43m) build in 2017.
Line 5 P+R Linkeroever.
Location: August Van de Wielelei.
17-02-2025
De Lijn 7358 Bombardier Flexity 2 XL(43m) build in 2017. Line 5 P+R Linkeroever. Location: August Van de Wielelei. 17-02-2025
Mark Min

Belgien / Spårvagnar / Spårvagn Antwerpen

341 1200x800 Px, 12.03.2025

De Lijn 7339 Bombardier Flexity 2 build: 2016 in operation since: 2016.
Line 26 Wijnegem via Centraal Station.
Location: metro station Plantin.
This was a temporary line, due to maintenance works in the metro tunnels between stations Opera and Van Eeden lines 3-5-9 and 15 were not operated on Sunday 09-03-2025. Instead there where 2 temporary lines:
Line 25: P+R Merksem – P+R Boechout (combination of 3 and 15).
Line 26: Wijnegem – Silsburg (combination of 5 and 9).
These lines served metro stations: Plantin – Diamant – Astrid – Elisabeth – Handel – Schijnpoort and Sport(only line 25).
09-03-2025
De Lijn 7339 Bombardier Flexity 2 build: 2016 in operation since: 2016. Line 26 Wijnegem via Centraal Station. Location: metro station Plantin. This was a temporary line, due to maintenance works in the metro tunnels between stations Opera and Van Eeden lines 3-5-9 and 15 were not operated on Sunday 09-03-2025. Instead there where 2 temporary lines: Line 25: P+R Merksem – P+R Boechout (combination of 3 and 15). Line 26: Wijnegem – Silsburg (combination of 5 and 9). These lines served metro stations: Plantin – Diamant – Astrid – Elisabeth – Handel – Schijnpoort and Sport(only line 25). 09-03-2025
Mark Min

Belgien / Spårvagnar / Spårvagn Antwerpen

350 1200x800 Px, 13.03.2025

De Lijn 7212 Siemens MGT6-1-1 build in 2000.
Line 4 Zwaantjes.
Location: Borsbeeksebrug.
09-03-2025
De Lijn 7212 Siemens MGT6-1-1 build in 2000. Line 4 Zwaantjes. Location: Borsbeeksebrug. 09-03-2025
Mark Min

Belgien / Spårvagnar / Spårvagn Antwerpen

280 1200x800 Px, 13.03.2025

De Lijn 7212 Siemens MGT6-1-1 build in 2000.
Line 3 P+R Melsele.
Location: metro station Van Eeden level-2 platform to Blancefloerlaan.
27-02-2025
De Lijn 7212 Siemens MGT6-1-1 build in 2000. Line 3 P+R Melsele. Location: metro station Van Eeden level-2 platform to Blancefloerlaan. 27-02-2025
Mark Min

Belgien / Spårvagnar / Spårvagn Antwerpen

285 1200x800 Px, 13.03.2025

De Lijn 7231 Siemens MGT6-1-1 build in 2001.
Line 5 P+R Linkeroever.
Location: Wijnegem Fortveld.
05-03-2025
De Lijn 7231 Siemens MGT6-1-1 build in 2001. Line 5 P+R Linkeroever. Location: Wijnegem Fortveld. 05-03-2025
Mark Min

Belgien / Spårvagnar / Spårvagn Antwerpen

263 1200x800 Px, 13.03.2025

De Lijn 7312 Bombardier Flexity 2 build in 2015.
Line 5 P+R Linkeroever.
Location: Wijnegem Fortveld.
05-03-2025
De Lijn 7312 Bombardier Flexity 2 build in 2015. Line 5 P+R Linkeroever. Location: Wijnegem Fortveld. 05-03-2025
Mark Min

Belgien / Spårvagnar / Spårvagn Antwerpen

293 1200x800 Px, 13.03.2025

De Lijn 7335 Bombardier Flexity 2 build in 2016.
Line 3 P+R Melsele.
Location: metro station Van Eeden level-2 platform to Blancefloerlaan.
27-02-2025
De Lijn 7335 Bombardier Flexity 2 build in 2016. Line 3 P+R Melsele. Location: metro station Van Eeden level-2 platform to Blancefloerlaan. 27-02-2025
Mark Min

Belgien / Spårvagnar / Spårvagn Antwerpen

283 1200x800 Px, 13.03.2025

De Lijn 7354 Bombardier Flexity 2 XL (43m) build in 2017.
Line 25 P+R Boechout.
Location: End station P+R Merksem.
This was a temporary line, due to maintenance works in the metro tunnels between stations Opera and Van Eeden lines 3-5-9 and 15 were not operated on Sunday 09-03-2025. Instead there where 2 temporary lines:
Line 25: P+R Merksem – P+R Boechout (combination of 3 and 15).
Line 26: Wijnegem – Silsburg (combination of 5 nand 9).
These lines served metro stations: Plantin – Diamant – Astrid – Elisabeth – Handel – Schijnpoort and Sport(only line 25).
09-03-2025
De Lijn 7354 Bombardier Flexity 2 XL (43m) build in 2017. Line 25 P+R Boechout. Location: End station P+R Merksem. This was a temporary line, due to maintenance works in the metro tunnels between stations Opera and Van Eeden lines 3-5-9 and 15 were not operated on Sunday 09-03-2025. Instead there where 2 temporary lines: Line 25: P+R Merksem – P+R Boechout (combination of 3 and 15). Line 26: Wijnegem – Silsburg (combination of 5 nand 9). These lines served metro stations: Plantin – Diamant – Astrid – Elisabeth – Handel – Schijnpoort and Sport(only line 25). 09-03-2025
Mark Min

Belgien / Spårvagnar / Spårvagn Antwerpen

365 1200x800 Px, 13.03.2025

De Lijn 7235 Siemens MGT6-1-2A build in 2004.
Line 4 Zwaantjes.
Location: Berchem Station.
03-03-2025
De Lijn 7235 Siemens MGT6-1-2A build in 2004. Line 4 Zwaantjes. Location: Berchem Station. 03-03-2025
Mark Min

Belgien / Spårvagnar / Spårvagn Antwerpen

264 1200x800 Px, 13.03.2025

De Lijn 7231 Siemens MGT6-1-1 build in 2001.
Line 4 Zwaantjes.
Location: Borsbeeksebrug.
09-03-2025
De Lijn 7231 Siemens MGT6-1-1 build in 2001. Line 4 Zwaantjes. Location: Borsbeeksebrug. 09-03-2025
Mark Min

Belgien / Spårvagnar / Spårvagn Antwerpen

292 1200x800 Px, 13.03.2025

De Lijn 7326 Bombardier Flexity 2 build in 2016.
Line 5 P+R Linkeroever.
Location: metro station Van Eeden level-2 platform to Blancefloerlaan.
27-02-2025
De Lijn 7326 Bombardier Flexity 2 build in 2016. Line 5 P+R Linkeroever. Location: metro station Van Eeden level-2 platform to Blancefloerlaan. 27-02-2025
Mark Min

Belgien / Spårvagnar / Spårvagn Antwerpen

304 1200x800 Px, 13.03.2025

De Lijn 7342 Bombardier Flexity 2 build in 2016.
Line 5 P+R Linkeroever.
Location: Wijnegem Fortveld.
05-03-2025
De Lijn 7342 Bombardier Flexity 2 build in 2016. Line 5 P+R Linkeroever. Location: Wijnegem Fortveld. 05-03-2025
Mark Min

Belgien / Spårvagnar / Spårvagn Antwerpen

289 1200x800 Px, 13.03.2025

De Lijn 7455 CAF Urbos 100 bi-directional build in 2024.
Line 10 P+R Schoonselhof.
Location: End station Wijnegem Fortveld.
05-03-2025
De Lijn 7455 CAF Urbos 100 bi-directional build in 2024. Line 10 P+R Schoonselhof. Location: End station Wijnegem Fortveld. 05-03-2025
Mark Min

Belgien / Spårvagnar / Spårvagn Antwerpen

314 1200x800 Px, 13.03.2025

De Lijn 7248 Siemens MGT6-1-2A build in 2004.
Line 4 Zwaantjes.
Location: Borsbeeksebrug.
09-03-2025
De Lijn 7248 Siemens MGT6-1-2A build in 2004. Line 4 Zwaantjes. Location: Borsbeeksebrug. 09-03-2025
Mark Min

Belgien / Spårvagnar / Spårvagn Antwerpen

287 1200x799 Px, 13.03.2025

De Lijn 7273 Siemens MGT6-1-3 build in 2012.
Line 4 Groenplaats.
Location: Borsbeeksebrug.
09-03-2025
De Lijn 7273 Siemens MGT6-1-3 build in 2012. Line 4 Groenplaats. Location: Borsbeeksebrug. 09-03-2025
Mark Min

Belgien / Spårvagnar / Spårvagn Antwerpen

292 1200x802 Px, 13.03.2025

De Lijn 7319 Bombardier Flexity 2 build in 2015.
Line 5 P+R Linkeroever.
Location: Wijnegem Fortveld.
05-03-2025
De Lijn 7319 Bombardier Flexity 2 build in 2015. Line 5 P+R Linkeroever. Location: Wijnegem Fortveld. 05-03-2025
Mark Min

Belgien / Spårvagnar / Spårvagn Antwerpen

290 1600x1066 Px, 14.03.2025

De Lijn 7331 Bombardier Flexity 2 build in 2016.
Line 5 P+R Linkeroever.
Location: metro station Van Eeden.
27-02-2025
De Lijn 7331 Bombardier Flexity 2 build in 2016. Line 5 P+R Linkeroever. Location: metro station Van Eeden. 27-02-2025
Mark Min

Belgien / Spårvagnar / Spårvagn Antwerpen

310 1600x1067 Px, 14.03.2025

De Lijn 7339 Bombardier Flexity 2 build: 2016.
Line 26 Silsburh via Berchem Station.
Location: Borsbeeksebrug.
This was a temporary line, due to maintenance works in the metro tunnels between stations Opera and Van Eeden lines 3-5-9 and 15 were not operated on Sunday 09-03-2025. Instead there where 2 temporary lines:
Line 25: P+R Merksem – P+R Boechout (combination of 3 and 15).
Line 26: Wijnegem – Silsburg (combination of 5 nand 9).
These lines served metro stations: Plantin – Diamant – Astrid – Elisabeth – Handel – Schijnpoort and Sport(only line 25).
03-03-2025
De Lijn 7339 Bombardier Flexity 2 build: 2016. Line 26 Silsburh via Berchem Station. Location: Borsbeeksebrug. This was a temporary line, due to maintenance works in the metro tunnels between stations Opera and Van Eeden lines 3-5-9 and 15 were not operated on Sunday 09-03-2025. Instead there where 2 temporary lines: Line 25: P+R Merksem – P+R Boechout (combination of 3 and 15). Line 26: Wijnegem – Silsburg (combination of 5 nand 9). These lines served metro stations: Plantin – Diamant – Astrid – Elisabeth – Handel – Schijnpoort and Sport(only line 25). 03-03-2025
Mark Min

Belgien / Spårvagnar / Spårvagn Antwerpen

308 1200x800 Px, 14.03.2025

De Lijn 7448 CAF Urbos 100 bi-directional build in 2024.
Line 10 P+R Schoonselhof.
Location: Wijnegem Fortveld.
05-03-2025
De Lijn 7448 CAF Urbos 100 bi-directional build in 2024. Line 10 P+R Schoonselhof. Location: Wijnegem Fortveld. 05-03-2025
Mark Min

Belgien / Spårvagnar / Spårvagn Antwerpen

326 1200x800 Px, 14.03.2025

De Lijn 7362 Bombardier Flexity 2 XL (43m) byggd 2018.
Linje 25 P+R Boechout.
Plats: Slutstation P+R Merksem.
Detta var en tillfällig linje, på grund av underhållsarbeten i metrotunnlarna mellan stationerna Opera och Van Eeden kördes inte linjerna 3-5-9 och 15 på söndagen 2025-03-09. Istället fanns två tillfälliga linjer:
Linje 25: P+R Merksem – P+R Boechout (kombination av 3 och 15).
Linje 26: Wijnegem – Silsburg (kombination av 5 och 9).
Dessa linjer trafikerade metrostations: Plantin – Diamant – Astrid – Elisabeth – Handel – Schijnpoort och Sport (endast linje 25).
2025-03-09
De Lijn 7362 Bombardier Flexity 2 XL (43m) byggd 2018. Linje 25 P+R Boechout. Plats: Slutstation P+R Merksem. Detta var en tillfällig linje, på grund av underhållsarbeten i metrotunnlarna mellan stationerna Opera och Van Eeden kördes inte linjerna 3-5-9 och 15 på söndagen 2025-03-09. Istället fanns två tillfälliga linjer: Linje 25: P+R Merksem – P+R Boechout (kombination av 3 och 15). Linje 26: Wijnegem – Silsburg (kombination av 5 och 9). Dessa linjer trafikerade metrostations: Plantin – Diamant – Astrid – Elisabeth – Handel – Schijnpoort och Sport (endast linje 25). 2025-03-09
Mark Min

Belgien / Spårvagnar / Spårvagn Antwerpen

337 1200x800 Px, 14.03.2025

De Lijn 7321 Bombardier Flexity 2 byggd 2015.  
Linje 26 Silsburg via Berchem station.  
Plats: Borsbeeksebrug.  
Detta var en tillfällig linje, på grund av underhållsarbeten i metrotunnlarna mellan stationerna Opera och Van Eeden kördes inte linjerna 3, 5, 9 och 15 på söndagen 2025-03-09. Istället fanns det 2 tillfälliga linjer:  
Linje 25: P+R Merksem – P+R Boechout (kombination av 3 och 15).  
Linje 26: Wijnegem – Silsburg (kombination av 5 och 9).  
Dessa linjer trafikerade metrostations: Plantin – Diamant – Astrid – Elisabeth – Handel – Schijnpoort och Sport (endast linje 25).  
2025-03-09
De Lijn 7321 Bombardier Flexity 2 byggd 2015. Linje 26 Silsburg via Berchem station. Plats: Borsbeeksebrug. Detta var en tillfällig linje, på grund av underhållsarbeten i metrotunnlarna mellan stationerna Opera och Van Eeden kördes inte linjerna 3, 5, 9 och 15 på söndagen 2025-03-09. Istället fanns det 2 tillfälliga linjer: Linje 25: P+R Merksem – P+R Boechout (kombination av 3 och 15). Linje 26: Wijnegem – Silsburg (kombination av 5 och 9). Dessa linjer trafikerade metrostations: Plantin – Diamant – Astrid – Elisabeth – Handel – Schijnpoort och Sport (endast linje 25). 2025-03-09
Mark Min

Belgien / Spårvagnar / Spårvagn Antwerpen

403 1200x800 Px, 14.03.2025

De Lijn 7357 Bombardier Flexity 2 XL (43m) byggd 2018.  
Linje 15 Regatta  
Plats: tunnelbanestation Van Eeden.  
27-02-2025
De Lijn 7357 Bombardier Flexity 2 XL (43m) byggd 2018. Linje 15 Regatta Plats: tunnelbanestation Van Eeden. 27-02-2025
Mark Min

Belgien / Spårvagnar / Spårvagn Antwerpen

341 1200x800 Px, 14.03.2025

De Lijn 7435 CAF Urbos 100 byggd 2023.  
Linje 10 P+R Schoonselhof.  
Plats: Slutstation Wijnegem Fortveld.  
05-03-2025
De Lijn 7435 CAF Urbos 100 byggd 2023. Linje 10 P+R Schoonselhof. Plats: Slutstation Wijnegem Fortveld. 05-03-2025
Mark Min

Belgien / Spårvagnar / Spårvagn Antwerpen

416 1200x800 Px, 14.03.2025

Spårvagn som kommer från Standardhållplatsen går längs Liège Guillemins station. Okt. 2025
Spårvagn som kommer från Standardhållplatsen går längs Liège Guillemins station. Okt. 2025
De Rond Hans und Jeanny

Belgien / Spårvagnar / Liège (Lüttich)

386 1200x801 Px, 04.10.2025

<<  föregående sida  1 2 3 4 5 6 7 8 nästa sida  >>





Statistik
 
Diese Webseite verwendet Cookies, um Inhalte und Anzeigen zu personalisieren und Zugriffe zu analysieren. Sie können zwischen personalisierter und nicht-personalisierter Werbung wählen.
Mit der Nutzung dieser Seite stimmen Sie der Verwendung von Cookies zu.