Steel train with 193 366 speeds through Blerick on 27 November 2020.
(ID 42365)
Steel train with 193 366 speeds through Blerick on 27 November 2020.
Leonardus Schrijvers 08.12.2020, 698 Views, 0 Comments
0 Comments, All comments
The Medway Belgium 7193 001, named: Alessia, from the port of Antwerp to Italy. Siemens Vectron MS build in 2025 with construction N° 24307. Line 27A at Antwerp Airport. 07-09-2026
Mark Min
Mark Min
Germany / Electric locomotives / 193 (Siemens Vectron X4E), Belgium / Private companies / Medway Belgium N.V.
14 1600x1066 Px, 09.09.2026
The Medway Belgium 6193 044 on route to the port of Antwerp. Siemens Vectron MS build in 2025 with construction N° 23630. Line 27A at Antwerp Airport. 07-09-2026
Mark Min
Mark Min
Germany / Electric locomotives / 193 (Siemens Vectron X4E), Belgium / Private companies / Medway Belgium N.V.
14 1600x1066 Px, 09.09.2026
The TCA 7193 209 double traction with the 7193 114 for the daily TCA shuttle from the TCA container terminal at Athus to the port of Antwerp. Siemens Vectron MS build in 2025 with construction N° 23978. Line 27A at Antwerp Airport. 02-09-2026
Mark Min
Mark Min
Germany / Electric locomotives / 193 (Siemens Vectron X4E), Belgium / Private companies / TCA (Terminal Container Athus)
66 1600x1066 Px, 04.09.2026
One operator, one loco number, two locos: RheinCargo has done it with Vectron number 193 106. One is 6 193 106, formerly with KRE and a nice advertising loco and the other is seen here: 7 193 106,rented from Alpha Trains and hauling a tank train through Neuwied towards Cologne. The Vectrons are the same type, but since there are 2,000+ X4E four system Vectron electrics, the EVR numbering scheme had to deploy the 7 after the six to accommodate all Vectrons.
Leonardus Schrijvers
Leonardus Schrijvers
Germany / Electric locomotives / 193 (Siemens Vectron X4E), Germany / Companies / Rheincargo
69 1200x800 Px, 03.09.2026








