rail-pictures.com
No registration required - use your Google-, Facebook- or X- account to log in! Hello guest, you are not logged in. Log in | Sign up for an account 
Forum   Contact   Imprint
English German French Italian Spanish Polish Dutch Mandarin / Chinese Indian 

MIB (Meiringen Innertkirchen Bahn) Fotos

1 Bilder
In Meiringen, the Ta 2/2 No. 3 can be admired; this battery-powered railcar was put into service by the Oberhasli Power Plant (KWO) in 1931 on the Meiringen-Innertkirchen line, which was still operated as an industrial railway at the time and first appeared in the timetable in 1946.

The Ta 2/2 No. 3 was decommissioned in 1977 and sold to the DEV (German Railways) in Bruchhausen-Vilsen as the T 46 in 1979.

In 2024, the Ta 2/2 No. 3 was exchanged for an unspecified Tm 3, and the Ta 2/2 3 was brought back to Meiringen.

August 23, 2025
In Meiringen, the Ta 2/2 No. 3 can be admired; this battery-powered railcar was put into service by the Oberhasli Power Plant (KWO) in 1931 on the Meiringen-Innertkirchen line, which was still operated as an industrial railway at the time and first appeared in the timetable in 1946. The Ta 2/2 No. 3 was decommissioned in 1977 and sold to the DEV (German Railways) in Bruchhausen-Vilsen as the T 46 in 1979. In 2024, the Ta 2/2 No. 3 was exchanged for an unspecified Tm 3, and the Ta 2/2 3 was brought back to Meiringen. August 23, 2025
Stefan Wohlfahrt

GALERIE 3





Statistik
 
Diese Webseite verwendet Cookies, um Inhalte und Anzeigen zu personalisieren und Zugriffe zu analysieren. Sie können zwischen personalisierter und nicht-personalisierter Werbung wählen.
Mit der Nutzung dieser Seite stimmen Sie der Verwendung von Cookies zu.